Laserfiche WebLink
)J?AC Mining Syateme _ TALPAC eyatem - Page 1 <br />04-Jun-199] 21:13:29 <br />A92-3 TO A ROAD (]632 YD$) <br />HAUL CYCLR CALCULATION for CATRRPILLAR 63]8 SBRIRS II <br />0aeed on Payload of 37.5 ^.S.cone (30.0 Dry) <br /> Cyele Average Maximum Fiv al Rolling Reetriet ions <br /> Diecan ce Time Time Velocity Velocity Velocity Czade SleY. Reei et. Maximum Pinel Peyl oad <br /> feet minutes • mph mph mph S feet \ mph mph 1 <br /> Queue st Loader 0.45 11.6 <br /> Spot at Loader 0.00 0.0 <br /> Loading 1.00 25.6 <br />1 Xsul Segment 301.1 0.35 9.0 9.B 19.6 19.6 -l .3 -10.0 4.0 Max Mex Pull <br />2 Xsul Segment 179.6 0.13 1.1 16.1 19.6 12.5 11.2 20.1 4.0 Max Max Pull <br />3 Heul Segment 368.2 p.29 7.5 14.4 15.4 15.4 2.7 10.0 4.0 Max Max Full <br />9 Xaul Segment 203.] 0.21 5.5 10.8 15.4 5.0 4.9 10.0 4.0 Nax 5.0 Pull <br /> Spot at pump 0.20 5.1 <br /> Dumping 0.50 12.8 <br />5 Hsul Segment 203.] 0.21 5.4 10.9 16.8 16.8 -4 .9 -10.0 4.0 Max Msx Rmpty <br />6 Xeul 9egme nt 368.2 0.19 1.9 22.1 25.9 35.3 -2.7 -i0.0 4.0 Max Max Empty <br />7 Maul Segment 379.6 0.09 2.l 22.8 25.3 20.1 -11.2 -20.1 4.0 Nax Max Smpty <br />B Heul Sagmant ]O].1 0.2] 7.0 13.6 20.3 5.0 3.3 10.0 4.0 Max 5.0 Empty <br /> lot al 2109.2 3.90 6.1 0.0 <br /> <br /> <br />