Laserfiche WebLink
I RPAC Mining Syetema TALPAC System - Page 1 <br />27-M ay-199] 15:36:5'1 <br />WB-3 TO W65TBU2 (1124 YDS) <br />I HAUL CYCLE CALCULATION for CATERPILLAR 63]6 SERIES II <br />Baeed on Payload of 3'1.5 U.S.tona (30.0 bcy) <br />tyole Average Maximum Pinal Rolling Re striations <br />Distance Time Time Velocity Yel oeity Velocity Gzade 83eV. Reei st. Maximuv Pinal Payload <br />feet minutes 4 mph nth mph 4 feet 4 mph mph 5 <br />Queue at Loedei 0.06 1.6 <br />Spot at Loader 0.00 0.0 <br />Loading 1.00 37.3 <br />1 Haul SegmenC 132.4 0.21 ].'! 6.5 13.0 13.0 -].6 -10.0 4.0 Maz Max Full <br />2 Haul Segment 262.4 0.1] 6.7 1].4 20.3 18.8 -3.8 -10.0 9.0 Max Max Pull <br />3 Haul Segment 140.] 0.10 3.3 16.0 18.8 13.2 -7 .1 -10.0 4.0 Mex Max Full <br />4 Hsul Segment 116.] 0.15 4.9 9.1 12.9 9.0 -8 .6 -10.0 4.0 Max 5.0 Pull <br />Spot at Dump 0.20 6.9 <br />Dumping 0.50 16.7 <br />5 Haul Segment 116.7 0.15 4.9 9.0 12.1 12.] B.6 10.0 4.0 Max Max Empty <br />6 Haul SegmenC 140.'! 0.12 3.9 13.8 14.8 19.8 7.1 10.0 4.0 Max Mex Empty <br />7 Haul 6agment 262.4 0.18 6.0 16.5 18.1 11.9 ].8 10.0 9.0 Maz Max Empty <br />B Hsul Segment 132.4 0.16 6.l 9.5 11.9 5.0 7.6 10.0 4.0 Mex 5.0 empty <br />Total 1304.4 3.00 9.9 0.0 <br />1/ ~, <br />1 <br />I <br />I <br />