Laserfiche WebLink
' XPAC Mining Syeteme TALPAC System - Pege 1 <br />2]-May-199] 14:5]:92 <br />• WR-2 TO WESTSUZ (1580 YDS) <br />Productivity Reaulta Eor Quick Estimate <br />LOADING <br />Availability [4] 0.00 <br />Operating Houra per Yeer [op.hre] 1800 <br />Operating Sh if to per Year Iehif [e/year) 240 <br />Average Loading Time [mine) 1.00 <br />We it Time per Oper. Hour [mine] 3.42 <br />Loading Methodology - Truck Poe it inning <br />Bucket Paaeea <br />Loading Unit Productivity <br />Par Operating Hour [bryJ 1501 <br />Par Shift [bry] 11260 <br />Per Yeai Ibry] 2]02400 <br />HAULACH UNIT <br /> CAIBRPILLAR 63]6 <br /> SBRIBS II <br />Pleat Size [numbsrl 3 <br />Average Ave ilebil i[y [4] 95.00 <br />Operating Hours per Year [op.hrel 1800 <br />Nominal Payload Ibey] 10.0 <br />Average Peyloed <br />• [bry] 30.0 <br />tycle Ave rages <br />Queue Time a[ Loader [minel 0.01 <br />Spot Tima et Loader [mine] 0.00 <br />Loading Time [mine] 1.00 <br />Travel Time lm ins] 1.35 <br />Spot Time at Dump [urinal 0.20 <br />Dumping Time [mine] 0.50 <br />Tot el Cycle Time [mina] 3.05 <br />Haulage Vn it Producc ivicy <br />Per Operating Hour [bry] 62] <br />Tyre Hndurance <br />Azle 1 [TMPHI 106 <br />Axle 2 [TMPH] 95 <br />Average Puel Coneumpt ion [U.S.gale/op.hr 6.l <br />PLBBT BCONOM ICS <br />Die counted Capital Coet [$/bry] 0.00 <br />Discounted Opeiet ing Coet [$/bry] 0.00 <br />Oiceounted Average Cost I$/bryl 0.00 <br />• <br />• ~~~ <br />