Laserfiche WebLink
%PAC Mining 9yateme_ TALPAC System - Pege 1 <br />03 -.7un-199] 19:13:11 <br />ASH2 TO ASH PUMP (27486 YDS) <br />HAUL CYCLB CALCUI.ATIOH for CATBRP ILLAR 63]6 SBRIBS II <br />Based on Payload of 3].5 U.S.[one (30.0 bey) <br />Cycle Average Maximum Pin el Rolling Restrictions <br />Diet ante Time Tima Veloe ity Velocity Velocity Crede Blav. Re aiat. Maximum Pinal Payload <br />Eeet minutee \ mph mph mph 4 fee[ ~ mph mph ~ <br />Queue aC Loader 0.15 3.0 <br />Spot at Loader 0.00 0.0 <br />Loading 1.00 20.1 <br />1 Haul Segment 229.1 0.39 7.8 6.6 8.2 8.2 8.9 30.1 6.0 Mai[ Max Pull <br />1 Haul Segment 34].1 0.58 11.6 6.8 B.2 6.7 11.6 40.4 4.0 Max Max Pull <br />] Haul Segment 3]0.8 0.64 12.9 6.6 6.7 6.6 12.1 45.0 4.0 Max Max Full <br />4 Haul Segment 339.7 0.64 12.8 6.0 6.6 5.0 13.3 45.3 4.0 Max 5.0 Full <br />Spot at Dump 0.20 4.0 <br />Dumping 0.50 10.0 <br />9 Haul Segment 339.] 0.30 5.9 13.0 18.7 18.7 -13.3 -45.3 4.0 Max Max empty <br />6 Hsul Segment 3]0.8 0.18 3.7 21.2 25.2 25.2 -12.1 -45.0 4.0 Max Max empty <br />] Haul Segment 147.1 0.18 3.5 32.3 25.2 17.6 -11.6 -40.4 4.0 Max Max Empty <br />8 Haul Segment 225.3 0.21 1.5 11.3 1].6 5.0 -B.9 -20.1 4.0 Max 5.0 Bmpty <br />Total ]569.8 4.98 5.9 0.0 <br /> <br />