Laserfiche WebLink
%PAC Mining <br />ASH1-H TO ASH ROAD (]8209 YDS) <br />HAUL CYCLE CALCULATION for CATHRPILLAR 63]6 SHRIHS II <br />Haeed on Payload of 37.5 U.S.tone (30.0 bcy) <br />PAC 9yetem - Paga 1 <br />03 -dun-199] 15:08:18 I <br />Cycle Average Maximum Final Rolling Re atri cCiona <br />Diec once Time Time Velocity Velocity Velocity Crede Elev. Ree iat. Maximum Pinal Payload <br />feet minutes ~ mph mph mph L feet - mph mph V <br />Queue at Londer 0.33 4.] <br />Spot at Loader 0.00 0.0 <br />Loading 1.00 14.5 <br />1 Naul Segment 414.2 0.43 6.2 10.9 18.6 <br />2 Haul Segment 2]8.3 0.23 3.3 13.8 13.8 <br />] Haul Segment 256.7 O.ll 2.4 17.4 18.6 <br />4 Haul Segment 613.2 0.27 ].9 26.1 33.5 <br />5 Haul Segment 580.2 0.19 2.8 14.1 39.1 <br />6 Haul Segment 1058.1 0.36 5.2 3].] 14.1 <br />7 Haul Segment 749.] 0.4] 6.8 18.1 11.3 <br />Spot a[ Dump 0.20 2.9 <br />Dumping 0.50 ].3 <br />0 Heul Segment ]49.7 0.54 7.8 15.9 20.7 <br />9 Hsul Segment 1058.1 0.48 7.D 25.1 2].] <br />10 Haul Segment 580.2 0.32 4.s 20.8 27.7 <br />11 Heul Segment 613.2 0.48 6.9 14.] 16.5 <br />12 Haul Segment 256.7 0.25 3.] 11.5 19.1 <br />13 Heul Segment 278.3 0.31 9.5 10.1 10.8 <br />14 Neul Segment 414.2 0.18 5.5 12.5 17.8 <br />Total 7900.8 6.89 11.0 <br />11.8 -2 .4 -10.0 4.0 Max Mix Full <br />13.8 -12.7 -35.4 4.0 Max Max Full <br />18.6 -11.8 -10.4 4.0 Max Max F031 <br />33.5 -8 .2 -50.2 4.0 Nex Max Pull <br />34.1 -6.9 -40.1 4.0 Max Mex Pull <br />31.1 -1.9 -20.0 4.0 Max Mex Pull <br />5.0 -1.0 -30.0 4.0 Max 5.0 Pull <br />20.7 4.0 10.0 4.0 Msx Max Empty <br />27.7 1.9 20.0 4.D Max Max Rmpty <br />16.5 6.9 40.1 4.0 Max Nax Bogaty <br /> <br />14.3 <br />0.2 <br />50.2 <br />4.0 <br />Mez <br />Max • <br />Empty <br />10.8 11.8 30.9 4.0 Max Max Rmpty <br />10.0 12.7 15.4 4.0 Max Max Rmpty <br />5.0 2.9 10.0 4.0 Max 5.0 Empty <br /> 0.0 <br /> <br />