Laserfiche WebLink
1CPAC Mining Syetama TALPAC System - Page 1 <br />• 03-Jun-199] 14: ~0: a6 <br />A]6-~ TO D ROADS (66]6 YD$) <br />Productivity Reeulto for Quick Batimate <br />LOAD INC <br />Avail ab Sl lty [~] 0.00 <br />Operating Hours per Year Iop.hre) 1800 <br />Operating 9hifte per Year [ehif to/year] 240 <br />Average Loading Time [mine] 1.00 <br />Wait Time per Oyer. Hour [mine] 1.98 <br />Loading Methodology - Tzvck Positioning <br />Bueket Panaee <br />Loading Unit Productivity <br />Per Operating Houz [bry] 1913 <br />Pei Shift [bry] 11498 <br />Per Yeer (bryl 2]59638 <br /> HAULAGE VNIT <br /> CATERPILLAR 6378 <br /> SERIES II <br /> Pleat Size Inumbe i] 6 <br /> Average Avail eb it ity [~] 95.00 <br /> Operating Hours per Year [op.hie] 1500 <br />• Nominal Payload [bry] 10.0 <br /> Average Peyloed [bry] 30.0 <br /> tycle Averages <br /> Queue Time at Loader [mina] 0.23 <br /> Spot Time st Loader [mine] 0.00 <br /> Loading alms [mine] 1.00 <br /> Trsvel Time (mine] 4.02 <br /> Spot Time et Dump [mine) 0.20 <br /> Dumping Time Lminal 0.50 <br /> Total tycle Tima [mina] 5.95 <br /> Haulage Unit Productivity <br /> Pet Operating Hour [bry] 269 <br /> Tyre endurance <br /> Axle 1 [TMPH] 169 <br /> Axle 2 [TMPH] 191 <br /> Average Puel Conn unapt ion [U.S.gale /op.hi 15.1 <br /> PL88T ECONOMICS <br /> Die counted Cepic el Co et IS/bry] 0.00 <br /> Discounted Operas ing Cost [$/bay] 0.00 <br /> Discounted Average Coet [$/bry] 0.00 <br />• MAY 1 3 158 <br />