Laserfiche WebLink
XPAC Mining Syeceme __ TALPAC System - Pege 1 <br />2]-Nay-1997 15:47:52 <br />BM-1 TO BC-RD (5456 YDe) • <br />HAOL CYCLE CALCVLATION for CATeRPILLAA 6376 ssRIBS IZ <br />Beeed on Payload of 3].5 U.s.cona (30.0 bcy) <br />Cycle Average Maximum P10e1 Ro13imJ Re stri ctloaa <br />Diatence Time Time Velocity Velocity Velocity Crade elev. Raaiec. Maximum Pinel Payload <br />feet minutes \ mph mph mph 4 feat \ mp4 mph 4 <br />Queue at Loader 0.01 0.2 <br />spot at Loader 0.00 0.0 <br />Loading 1.00 11.2 <br />1 Hsul 9egme nt 184.8 0.2] B.5 ].] 15.0 15.0 0.0 0.0 4.0 Max Nax Pull <br />2 Haul Segment 293.6 0.17 5.2 19.] 13.6 13.6 -3.4 -10.0 4.0 Max Nax Pull <br />3 Haul Segment 217.8 0.12 3.8 10.1 23.6 16.7 -4 .6 -10.0 4.0 Max Max Pull <br />4 Haul Segment 199.2 0.21 6.5 10.8 16.7 5.0 -5.0 -10.0 4.0 Mai 5.0 Pull <br />spot at Dump 0.20 6.1 <br />Dumping 0.50 19.6 <br />5 NeYl Segment 199.2 0.21 6.5 10.0 15.8 15.8 5.0 10.0 4.0 Xax Max Empty <br />6 Haul Segment 11].8 0.14 1.4 1].3 18.1 18.2 4.6 10.0 4.0 Nax Max Empty <br />7 Haul Segmeat 291.6 0.18 5.9 18.8 20.1 16.1 1.4 10.0 4.0 Max Max Empty <br />B Hsul Segment 184.8 0.20 6.2 10.6 16.1 5.0 0.0 0.0 4.0 Mai 5.0 Empty <br />Total 1786.8 1.11 6.3 0.0 • <br /> <br /> <br />