My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE115346
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE115346
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:11:22 PM
Creation date
11/25/2007 12:44:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005071
IBM Index Class Name
Permit File
Doc Date
2/22/2006
Doc Name
Response
From
OSE
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER -'` RECEIVED <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 ~FEB 2 2 2006 <br />Denver, Colorado 80203 <br />Phone (303) 866-3581 ~ ,i <br />FAX (303) 866-3589 Division of Minerals end G~~pgIO¢ <br />www.watecstate.co.us Response to Reclamation Permit Application l'o~Stderation <br />DATE: February 22, 2006 <br />TO: Steve S. Shuey, Senior Environmental Protection Specialist <br />CC: Division 4 Office; District 40 Water Commissioner <br />FROM: Cynthia 7. Love, Water Resource Engineer~~ <br />RE: Operator: Benson Brothers, Benson Brothers Red Shale Pit-, File No. M-2005-071 <br />Section 13, Twp 13 S, Rng 95 W, 6th P.M., Delta County <br />Landowner- Benson Brothers <br />of eon <br />~r~ <br />~s <br />~ /896 ~ <br />Bill Owens <br />Governor <br />Russell George <br />Exemtive DireROr <br />Hal D. Simpson, P.E. <br />Sra[e Engineer <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground water must not <br />occur during or after rnining operations. <br />^ The proposed operation will consume ground water by ^evaporation, ^dust control, ^reclamation, ^water <br />removed in the mined product, ^processing, ^other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or other type <br />of well pemlit, as applicable. Prior to obtaining a pemtit, an approved water supply plan or decreed plan for <br />augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a fie]d inspection of the site and document the <br />locations of all wells within 600 feet mile of the permit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the pemlit area or contact this office regarding the <br />600 foot spacing notification/hearing process. <br />^ The proposed operation may have potential impact on existing water rights near the project location. Please <br />provide evidence that the proposed project will not alter or impact [he historic operation of existing water rights. <br />^ The applicant has indicated plans to use other water for:_dust connol_uses at the permit site, storage in <br />the excavated area(s). The applicant will need to provide evidence to this office that the water is permitted or <br />decreed for such uses. <br />^ Other: <br />COMMENTS: Our comments of December 15, 2005 still apply and are repeated below. <br />The applicants state that water for dust control will be obtained by the operator by hauling water from an offsite, <br />adjudicated water right. The applicant should provide [be name of [he water right and all applicable water court case <br />numbers. <br />
The URL can be used to link to this page
Your browser does not support the video tag.