Laserfiche WebLink
• Indirect Costs <br />The following aze indirect costs associated with the reclamation of the Yoast Mine. <br />• Liability Insurance (2.02% of Direct Cost) <br />• Performance Bond (1.05% of Direct Costs) <br />• Job Superintendent (at $37.50/hr) <br />• Profit (10.0% of Direct Costs) <br />Contract Amount (Direct + Indirect Costs) <br />• Engineering.Wo;k.and Contract/Bid Preparation (4.25% of Contract) , <br />• Reclamation Management and Administration (3.25% of Contract} <br />Total Bond Amount (Contract + Engineering + RecLamaton Management) <br />Cost Summary <br />• Based on the Division's recalculated reclamation cost estimate fot RN-02, the new liability fox the <br />Yoast Mine is $4,918,223. This is less than the bond amount of $5,200.000 currendy held by the <br />Division. <br />r 1 <br />L_J <br />PR-02 8 Revised 01/06 <br />