Laserfiche WebLink
_~ \ <br />2 <br />6. Annual or noxious weeds will be controlled on all disturbed areas as <br />directed by the ilhite River Resource Area ilanager. Flethod of control <br />shall be by an approved mechanical method or an Environmental Protection <br />Agency (EPA) registered herbicide. All herbicide application proposals <br />must be approved by the BLM. Application of herbicides must be under <br />direct field supervision of an EPA certified pesticide applicator. <br />7. When construction of the pipeline (right-of-way C-40665) for Fuel <br />Resources Development Corporation begins, mining operations must be <br />conducted so as not to interfere with construction or operations of <br />pipeline. <br />8. Benches will be built 15' wide by 20' high to maintain slope stability <br />and provide safety benches for falling rocks. <br />9. Additional stipulations maybe required by the Authorized Officer after <br />mining begins to insure safety and ensure reclamation of the area. <br />162:F 81:CKETT:br:04/16/87:18720 <br />y- W- - -- - .....__. _ .. _. 1 <br />