Laserfiche WebLink
AUG-06-04 11:23 FROt1-Colorado Division of tlinerals d Geolc¢y +13036663567 <br />STATE QF <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Naniral RQSpurCeS <br />1313 Sherman Street Roam 818 <br />Denver, Cdorado 60203 <br />Phone (303) 866.3581 <br />Fnx (303) 866-3589 <br />www.vYdt2r.5tdt2.C0.uS <br />61C1SC7~3 ~~~ <br />AUG R 3 2~?~4 <br />Division of Minerals and Geolayy <br />T-319 P.002/002 F-375 <br />Response to Reclamation Pernrtit Application Consideration <br />DATE: August 3, 2004 <br />TO: Wallace Ii. Erickson, Environmental Protection Specialist <br />CC: Division 7 Office; Dishipt 71 Water Commissioner <br />PAOM: Don West, P.E. J <br />RE: Cedar Point Picture Rock Quarry Pit, File No. M-2004-048 <br />Operator: Robert Daugherty <br />Contact: Robert Daugherty 970/434-8773 <br />Section 25, Twp 45N, Rng 18W, NM P.M., San Miguel County <br />1,e <br />w <br />,r <br />x t <br />~ lfi46 ~ <br />sill Owens <br />Governor <br />Russell (,¢prge <br />txea~we oi(CQer <br />Hal n. Simpmn, P.E. <br />Stale Erry)neer <br />CONDITIONS FOR APPROVAL <br />® The proposed operation dots not anticipate exposing groundwater- There£are, exposure of Bound <br />water must not occur dutiag or after mining operations. if stormwater is contained on-site, it ttnrst <br />infiltrate into the Bound or be released to the natural stteam system within 72 hours, or all wnrk <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsire for more than 72 h. curs <br />unless an augmentation plan approved by water court is obtained. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, <br />[] reclamation, ^ water removed in the mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gavel pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approve[ water <br />supply plan m decreed platy for augmentation is acquired. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit ;uea or <br />request a hearing before the State Engineer. <br />^ Other: <br />COMMENTS: <br />