Laserfiche WebLink
<br />EXHIBIT D Reclamation Plan <br />As previously mentioned, the mine area currently has an existing <br />open pit face and the area has been stripped, therefore, there is <br />no i:opsoil or overburden to be removed in the excavation area. <br />Upon completion of the excavation, the newly affected portion of <br />the pit wall will be sloped at 3:1 or greater. <br />As t:he topsoil in the stockpile and existing plant site area is <br />minimal, reclamtion will consist of scarifying the area with a <br />plow or disc, drilling the seed and then using a straw mulch <br />crimped in place at a minimum rate of 2 tons per acre. Seeding <br />and fertilizer application rates will be determined as per S.C.S. <br />attached recommendations. <br />There will be no ponds or buildings remaining on-site as a result <br />of this operation. <br />