Laserfiche WebLink
<br />this is actually to be done as a measure to minimize <br />disturbance to the hydrologic balance, prevent offsite damage <br />etc. <br />EXHIBIT D-Reclamation Plan: Rule 6.3.4 of the Mineral Rules <br />states that the elements of this plan must be correlated with <br />the Exhibit E Map which has not entirely been done. A <br />listing of the elements of the reclamation plan that must be <br />indicated on the Exhibit E Map will be covered in a subsequent <br />discussion of that Exhibit. <br />The application does not contain a specific commitment as to <br />the gradient of reclaimed slopes. The reclamation plan <br />provided for the application is worded "should be sloped" and <br />!~'~•* the Division wants a "will be sloped" at a certain gradient. <br />` D(1h Please provide a commitment to slope the reclaimed surfaces at <br />~~('" a certain gradient and, if steeper than 3:1, provide <br />~\~ justification that supports these steeper slopes as acceptable <br />for the proposed post mining land use and demonstrates <br />compliance with the applicable performance standards of Rule <br />3.1. <br />' The application contains a commitment to fertilize "unless <br />a ~ field evidence or a laboratory soil analysis indicates <br />JJ~.,}F1p sufficent amounts of nitrogen and phosphorus...". Please <br />__.n13a ~~' provide a commitment to provide the Division such evidence or <br />~,P1111NN°°n~~ND analysis for Division approval prior to any decision by the <br />~,,a.~ operator not to fertilize as part of the revegetation effort. <br />~~ ~ ~ The application does not commit the operator to a particular <br />`~~' method of seeding. The wording in the reclamation plan is <br />~~G <br />'~ reclamation of the site? <br />~' EXHIBIT E-Mao: The application contains two maps as required <br />by Rule 6.3.5 but the maps do not contain all the required <br />information. <br />' "should be planted with a drill...". Please provide a <br />1r0 ~ commitment as to an application method for the seeding. <br />~,~. <br />The application indicates under the reclamation plan that a <br />U~ diversion may be needed. Is it intended that a diversion <br />U ditch be installed? If is is, will this remain after <br />vti ~ reclamation or is it intended to remove this as part of the <br />i__~ Neither map actually has the proposed permit boundaries <br />p U° labeled. Neither map indicates where the topsoil stockpiles <br />~QO will be located or any overburden stockpiles or any product <br />~r' stockpiles. Please provide maps that include this <br />~~ information, where applicable. <br />~ Exhibit E1, presumably the Mining Plan Map, does not indicate <br />the direction of the mining. Please indicate on the map the <br />direction that mineral extraction will proceed. <br />