Laserfiche WebLink
<br />• <br /> <br />A total of approximately 3,900 acres are contained within the Seneca II-W permit <br />boundary. This number excludes the Tie-across Haul Road permit area of <br />approximately 200 acres. Exhibits 20-1 and 20-1A depict areas that could <br />potentially be disturbed during this permit term 12001-20051. The boundaries shown <br />on this map were drawn to allow some degree of flexibility in operations. That is, if <br />a haulage road had to be moved due to field adjustments, or a highwall reduction <br />area required additional slope area, these operations could be conducted without <br />revisions to the permit. In actuality, haul road disturbance is confined to a corridor <br />approximately 150 Teet to 200 feet wide. The acreages given below reflect the <br />shaded areas as shown on Exhibits 20-1 and 20-1A and the revegetation maps, <br />Exhibit 22-1 and 22-1 A. These areas are conservatively overestimated for the <br />reasons stated above. <br />Disturbance Areas: <br />Actual Mine Disturbance Area 11989-20001 <br />Minimal Disturbance Area <br />Future Disturbance Aree 2001-2005 <br />Total <br />11 Includes Haul Roads I, J and K <br />21 Not included in the total <br />13 <br />= 923.7' ac <br />= 58.6' ac <br />= 533.9 ac <br />= 1457.6 ec <br />Revised 04/01 <br />