Laserfiche WebLink
<br />CMLRB Hearing Exhibits <br />Page 6 <br />Visual Impact Analysis Technical Appendix <br />Figure 1 - Location of Photographic Points, Panoramic Angles, and Cross Sections (11 x 1'n <br />Figure 2 - Areas of Rabbit Mountain Open Space with No Visibility of Dowe Flats (8-1/2 <br />x 11) <br />Appendix A Photographs 1 - 21C <br />Appendix B Cross Sections A-A' through F-F' Pre-mining and Post-Reclamation (7 11x17) <br />Phasing of Mining and Reclamation <br />FIGURE 1: Location and Acreage of Mine Development Activities (large foldout) <br />FIGURE 2: Annual Phases of Mining by Ridge (large foldout) <br />FIGURE 3: Footprints of Reclamation Areas and Years of Conswction (large foldout) <br />FIGURE 4: Status of Mining and Reclamation: Year 5 pazge foldout) <br />FIGURE 5: Status of Mining and Reclamation: Year 10 (large foldout) <br />FIGURE 6: Status of Mining and Reclamation: Year 15 (lazge foldout) <br />FIGURE 7: Status of Mining and Reclamation: Year 20 (large foldout) <br />Environmental Noise Impact Assessment <br />Figure III-1 24-Hour Measurement Locations (8-1/2 x 11) <br />Figure V-1 Haul Route 1 (8-1/2 x 11) <br />Figure V-2 Haul Route 2, 25-ton Haul Trucks (8-112 x 11) <br />Figure V-3 Haul Route 2, 85-ton Haul Trucks (8-1/2 x 11) <br />Figure V-4 55 dB(A) Contour During Stripping (8-1/2 x 11) <br />Figure V-5 55 dB(A) Contour During Mining Within the Pit (8-1/2 x 11) <br />