Laserfiche WebLink
~ III IIIIIIIIIIIIIIII <br />EXHIBIT C <br />• ry' <br />~~ <br />...~ <br />RECEIVED <br />AUG 2 5 199i3 <br />DIV. i <br />1. The date of commencement shall be from August 28"' 199 s <br />approximately August 28`h, 2018. <br />2. The mining plan is to take between 2-4" of topsoil off, take the gravel/sand <br />underneath, replace the topsoil and reseed as required. <br />3. The proposed road to be used for the mining operation is southwest of the pit <br />area, heading west and utilizing approximately 1207.8ft for this purpose until <br />County Road 3 is encountered. <br />4. Since the gravel mined will be utilized "as is" for county road maintenance, <br />there will be no additional processing. This operation will be strictly for <br />digging for sand and gravel with no other secondary, or incidental use. <br />