Laserfiche WebLink
CIRCES Cost Estimation Software <br />PROJECT IDENTIFICATION <br />Task # : 005 <br />Date : 06/19/2006 <br />User : ESC <br />Agency or organization name :DMG <br />Permit or other job action :New 112 Applicati <br />Task descdption :Rip Stockpile & <br />HOURLY EQUIPMENT COST <br />State :Colorado <br />County :Weld <br />Site :Packer-Dersham Site <br />Sales Areas <br />Basic machine :Cat D8R Seces 11 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank cpaer <br />Shift basis : 1 perday <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $53.92 NA <br />Dozer operating cost/hour : $75.29 100 <br />Ripper operating cost/hour : $7.98 100 <br />Operator cosUhour : $32.53 NA <br />Total unit cosUhour : $169.72 Total Fleet cosUhour : 5169.72 <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 8.50 acres Rip depth (ft) : 3.00 Volume : 41,140 BCY or CCY <br />Source of estimated quantity :DMG Estimate <br />Source of estimated load factor :NA <br />:::: <br />.., .:: <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity : NA feeUsecond <br />Unadjusted production : NA cu. yds./hour <br /> <br />Area : Avg. dpping depth : 2.56 feeUpass <br />Average ripping width : 7.08 feeUpass <br />Average ripping length : 100.00 feeUpass <br />Average dozer speed : 88.00 feeUminute <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.703 acres/hour <br />Unadjusted production : 2,905.25 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 1 dazer(s) <br />Unit cost : $0.070 per cu. yd. <br />8SU Horsepower: 310 <br />Unadjusted production <br />per selected method : 2,905.25 cu. yds./hour <br />Site altitude : 4,950 feet <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shifUday) <br />Netjob correction : 0.83 multiplier <br />Adjusted unit production <br />Adjusted fleet production <br />Permit/job # :M-2006-003 <br />Abbreviation :none <br />Filename :M003-005 <br />Total job time <br />Total job cost <br />2,411.36 <br />2,411.36 <br />17.06 <br />cu. yds./hour <br />cu.vds./hour <br />hours <br />