Laserfiche WebLink
sheet 1 of 2 <br />Task # <br />Date <br />User <br />CIRCES Cost Estimating Software <br />Agency or organization name :DMG <br />001 State :Colorado <br />06/19/2006 <br />ESC <br />County :Weld <br />Site :Parker-Dersham Mine <br />PermiUjob # : M-2006-003 <br />Abbreviation :none <br />Filename :M003-001 <br />Permit or other job action : New f 12 <br />Task description :Replace 10" of Topsoil on Phase 1 <br />HOURLY EQUIPMENT COST <br />Shiff basis : 1 per day <br />Description <br />Cost Bre <br />Scraper work team -Scraper :Cat 637G <br />-Push dozer : NA <br />Support equipment -Load area :NA <br />-Dump area :Cat D8R Series 11 - 8SU <br />Road maintenance -Motor grader :NA <br />-W ater truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Gradar Water truck <br />Import data filename : scraper2 NA NA dozer NA NA <br />Utilization-machine : 100 NA NA 100 NA NA <br />-Ripper attachment: NA NA NA 0 NA NA <br />OwnerhipcosUhour: $79.07 NA NA $53.92 NA NA <br />OperatingcosUhour: $184.89 NA NA $75.29 NA NA <br />Ripper op.cost/hour: NA NA NA $0.00 NA NA <br />OperatorcosUhour: $32.72 NA NA $32.53 NA NA <br />Unit subtotals : $296.67 NA NA $161,74 NA NA <br />Number of units : 2 0 0 1 0 0 <br />Group subtotals : Work : $593.35 Support : $161.74 Maintenance : $0.00 <br />Total work team cosUhour : x755.09 <br />MATERIAL QUANTITIES <br />Initial Sweli Loose <br />volume : 9,948 LCY factor : NA <br />volume : 9,948 LCY <br />Source of quantity take-off :DMG Estimate <br />Source of estimated swell factor :NA <br />