My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE114972
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE114972
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:11:03 PM
Creation date
11/25/2007 12:20:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
Permit File
Doc Date
10/5/1983
Doc Name
Permit Appl.- Ex. A through I
From
INDUSTRIAL RESOURCES INC
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• D,3.7 Affected AcreacZe <br />The total disturbed acreage associated with the proposed Pilot Plant will be <br />X3.9 acres. The areas of disturbance are shown on Figure D-1. The <br />component parts of th•e disturbed areas are indicated in Table D-2, Per Rule <br />2 of the MLRD Regulations, the majority of the disturbance will fall into <br />the "moderate disturbance" category. For the purposes of this permit <br />application, it is assumed that reclamation of the area will commence only <br />after the Pilot Plant has ceased operation. <br />Table D-2 COMPONENT PARTS OF DISTURBED AREAS <br />Disturbance Type <br />Acreage <br />Plant Site <br />Evaporation Pond kl <br />Evaporation Ponds N2 and N3 <br />Well Field <br />Topsoil Stockpiles <br />• <br />D.3 ,8 Schedule and Production Rates <br />1.2 <br />2.5 <br />5.4 <br />2.4 <br />2.4 <br />Total 13.9 <br />The anticipated project schedule is presented in Figure D-8. As indicated, <br />well drilling will begin 1 April 1984, and nahcolite mining will begin 1 <br />November 1984, Pilot mining operation will proceed for 1 to 2 years. <br />The Pilot Solution Mine will operate 24 hours per day, seven days per week. <br />Maintenance will be scheduled, as required. Since the proposed mining plan <br />involves solution mining, the only underground maintenance required relates <br />to scaling in the production piping. <br />D.4 ANCILLARY FACILI~fIES <br /> <br />D-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.