Laserfiche WebLink
50' GASLINE <br />EASEMENT <br />10' UNITED <br />POWER <br />EASEMENT <br />I' TIMOTHY D. & JERI E. <br />J I I REISBECK <br />"- X - <br />I - <br />PERIMETER FENCE <br />ALONG ALL PROPERTY <br />LINES (TYP.) <br />i <br />I� <br />ep <br />11��jrt <br />/�) bE:TBACK <br />0 <br />122' <br />SETBACK <br />ROBERT P <br />LLANO <br />VILLANO BROTHERS <br />PROPERTIES, INC. <br />North <br />GAS WELL <br />AN <br />90' <br />SETBACK <br />0 50' 100' 200' <br />SCALE: 1`300' <br />North <br />0 300' 600' 1200' <br />4 � <br />SCALE: 1"=600' <br />RECLAMATION PLANT SCHEDULE <br />Common Name <br />i Botanical Name <br />Qty <br />Planting Size <br />EVERGREEN TREES - 9 TOTAL: <br />GRADE IN IRRIGATED AREAS AND AT GRADE TO 2' <br />GRASSES: <br />Ponderosa Pine <br />Pinus ponderosa <br />5 <br />6' B &B <br />Colorado Spruce <br />Picea Pungens <br />4 <br />6 8 &B <br />DECIDUOUS TREES -17 TOTAL: <br />4' KRAFT TYPE TREE WRAP. <br />TREES TO CREATE A WATERING BASIN. BERM IS <br />Green Ash Fraxinus erns vanica <br />9 <br />2' CALIPER <br />Hackberry Celitus occidentalis <br />8 <br />2' CALIPER <br />LARGE SHRUBS - 86 TOTAL• <br />Blue Grama <br />AREAS & MULCH. LEAVE BERM & MULCH IN <br />Thinleaf Alder <br />Alnus incano ssp. tenuifolia <br />37 <br />5 GALLON <br />Smooth Sumac <br />Rhus glabro <br />24 <br />5 GALLON <br />Chokecherry <br />Prunus virginiana <br />25 <br />5 GALLON <br />PRUNE DEAD OR DAMAGED <br />BRANCHES PRIOR TO PLANTING. <br />IF FORM IS COMPROMISED BY <br />PRUNING, REPLACE SHRUB. <br />SPACE PLANTS AND SET PLUMB <br />FOR BEST EFFECT. <br />MOUND COMPACTED BACKFILL <br />UNDER ROOTBALL OR <br />SET ON UNDISTURBED SOIL <br />REMOVE ALL CONTAINERS, BASKETS, <br />WARE ETC. FROM ROOTBALL <br />SH <br />SEED SCHEDULE <br />Scientific Name <br />DO NOT PRUNE OR DAMAGE <br />NOTE SET ROOT BALL OF ALL TREES 4' ABOVE <br />100% PLS /Acre <br />CENTRAL LEADER. <br />GRADE IN IRRIGATED AREAS AND AT GRADE TO 2' <br />GRASSES: <br />E <br />ABOVE GRADE IN NON- IRRIGATED AREAS. MODIFY <br />2 <br />WRAP TRUNK FROM GROUND <br />IF SOIL CONDITIONS WARRANT & PER CITY <br />Pascopyrum smithii <br />LEVEL TO SECOND BRANCH WITH <br />DIRECTION. INSTALL A 5' HIGH BERM AROUND <br />16.00 <br />4' KRAFT TYPE TREE WRAP. <br />TREES TO CREATE A WATERING BASIN. BERM IS <br />Panicum vir atum <br />SECURE ENDS WITH FLEXIBLE <br />TEMPORARY IN IRRIGATED AREAS. REMOVE BERM <br />4.5 <br />TAPE. <br />AFTER TWO THOROUGH WATERINGS IN IRRIGATED <br />Boutelona qracillis <br />Blue Grama <br />AREAS & MULCH. LEAVE BERM & MULCH IN <br />3.0 <br />STANDARD GUYING SYSTEM: (ONLY WHERE <br />NON- IRRIGATED AREAS & IN AREAS ONLY <br />Boutebua curtipendula <br />NECESSARY) MIN. 6' LONG HEAVY DUTY <br />IRRIGATED BY DRIP SYSTEMS AFTER DRYLAND <br />9.0 <br />T -BAR STEEL POST STAKES WITH WHITE <br />GRASS ESTABLISHMENT PERIOD. <br />- <br />T -POST CAPS AND WITH 17 GAUGE <br />4' DEEP WOOD CHIP MULCH FLUSH <br />7.0 <br />GALVANIZED STEEL WIRE GUYS SECURED TO <br />WITH SOD AT EDGE. & TO BE KEPT 2' <br />Still Vridula <br />TREE WITH CANVAS STRAP ABOVE FIRST <br />FROM TRUNK. <br />J� - <br />BRANCH. WIRE TO BE TAUT BUT NOT OVER - <br />1.5 <br />¢" U <br />TIGHT. FLAG WARE WITH WHITE PLASTIC <br />ALTERNATE CONIFER GUYING SYSTEM: <br />FLAGGING TAPE. CONIFERS TO HAVE 2 STAKES <br />EQUALLY SPACED 30' STEEL STAKES WITH <br />FOR TREES 6' AND LESS, 3 STAKES FOR <br />WHITE TOPS, SET FLUSH WITH GRADE. GUY <br />TREES ABOVE 6'. DECIDUOUS TREES TO HAVE <br />TO MID -POINT OF TREE & FLAG WIRE WIT} <br />FORBS: <br />2 STAKES FOR TREES 2 -1/2' CAL. AND LESS, <br />1/2' DIAMETER WHITE PVC PIPE. <br />_ _ <br />3 STAKES ABOVE 2 -1/2' CAL, ONE STAKE <br />Daleo purpurea <br />ALWAYS IN DIRECTION OF PREVAILING WANDS. <br />REMOVE BOTTOM 1/3 OF WIRE BASKET. SET TREE _I -1 <br />-III 11 =III= <br />REMOVE STAKES & GUYS AFTER 1 SEASON. <br />-._ - <br />IN PIT TO PROPER GRADE AND PLUMB. REMOVE 1 =I = "I <br />-11 -I <br />- PREPARED BACKFILL MIXTURE: <br />REMAINING WIRE & TWINE. IF PLASTIC OR 'TREATED III -III II <br />1 =11 III <br />=1 1. ONE PART COMPOST OR <br />BURLAP, REMOVE AS MUCH AS POSSIBLE & IIIIIIIIII:I_ <br />- -III- 11 =III- <br />APPROVED EQUAL <br />-_ <br />BACKFILL. IF REGULAR BURLAP, BACKFILL 2/3 OF rli= 111111 =1TI <br />-ITT- ITT= 1i1- �IIH11- 1Ti�n- �IITIII- Ill�l�n�� <br />2. TWO PARTS TOPSOIL. <br />PIT, REMOVE TOP 1/3 OF BURLAP & COMPLETE <br />Scarlet Globemallow <br />BACKFILL. <br />3. THREE PARTS NATIVE SOIL. <br />UNDISTUFBED SOIL <br />DIAMETER 2x'S <br />BALL WIDTH <br />4. <br />4. MATERIALS TO BE THOROUGHLY <br />TREE PLANTING DETAIL <br />0.5 <br />NOT TO SCALE <br />PRUNE DEAD OR DAMAGED <br />BRANCHES PRIOR TO PLANTING. <br />IF FORM IS COMPROMISED BY <br />PRUNING, REPLACE SHRUB. <br />SPACE PLANTS AND SET PLUMB <br />FOR BEST EFFECT. <br />MOUND COMPACTED BACKFILL <br />UNDER ROOTBALL OR <br />SET ON UNDISTURBED SOIL <br />REMOVE ALL CONTAINERS, BASKETS, <br />WARE ETC. FROM ROOTBALL <br />SH <br />SEED SCHEDULE <br />Scientific Name <br />Common Name <br />Variety <br />100% PLS /Acre <br />% of Mix <br />Total Ibs PLS /Acre <br />GRASSES: <br />E <br />EXISTING OVERHEAD <br />2 <br />POWER <br />G- <br />Pascopyrum smithii <br />Western Wheat rass <br />Arriba <br />16.00 <br />15% <br />2.4 <br />Panicum vir atum <br />Switch grass <br />TELEPHONE PEDESTAL <br />4.5 <br />15% <br />0.7 <br />Boutelona qracillis <br />Blue Grama <br />Lovin ton <br />3.0 <br />25% <br />0.8 <br />Boutebua curtipendula <br />Sideoats Grama --Vaughn/Butte <br />9.0 <br />15% <br />1.35 <br />Schizochyrium sco arium <br />Little Bluestem <br />Cimarron Came <br />7.0 <br />15% <br />1.0 <br />Still Vridula <br />Green Needlegrass <br />Lodorm <br />10.0 <br />15% <br />1.5 <br />TOTAL <br />100% <br />7.75 <br />FORBS: <br />Daleo purpurea <br />Purple Prairieclover <br />0.5 <br />Atriplex canescens <br />Fourwing Saltbush <br />0.5 <br />Ratibida columnifera <br />Prairie Coneflower <br />0.5 <br />S haeralcea coccinea <br />Scarlet Globemallow <br />0.5 <br />Penstemon virgatus <br />var. asa grayi <br />Little Bluestem <br />0.5 <br />LEGEND: <br />3 <br />PERMIT BOUNDARY <br />NO. <br />EXISTING WATER <br />- - <br />EXISTING 1' CONTOURS <br />QI <br />EXISTING POWER POLE <br />E <br />EXISTING OVERHEAD <br />2 <br />POWER <br />G- <br />EXISTING GAS LINE <br />451 Oak Street, Suite 209 <br />C I V I L R E SOU R C E S, L LC P.O 8 o 14 6 Frederick <br />8330 850 80530 <br />DESIGNED BY: DO JOB NO. DWG: <br />DRAWN BY: ARR /SR DATE: SEPT. 2004 DMG- Revised for Adequacy Response 3 -25 -05 <br />CHECKED BY: DO SCALE: AS NOTED SHEET: 7 OF 7 <br />GAS MARKER <br />© <br />PETROLEUM WELL <br />Li <br />GAS /OIL EQUIPMENT <br />III <br />TELEPHONE PEDESTAL <br />X- <br />FENCE <br />3 <br />EXISTING TREE <br />NO. <br />EXISTING STRUCTURES <br />- - <br />TOP OF GRADE OF <br />1 <br />RECLAIMED PONDS <br />11/9/04 <br />GRAVEL ACCESS ROAD <br />2 <br />NAME CHANGE PER DMG <br />2/20/0 <br />UPLAND <br />451 Oak Street, Suite 209 <br />C I V I L R E SOU R C E S, L LC P.O 8 o 14 6 Frederick <br />8330 850 80530 <br />DESIGNED BY: DO JOB NO. DWG: <br />DRAWN BY: ARR /SR DATE: SEPT. 2004 DMG- Revised for Adequacy Response 3 -25 -05 <br />CHECKED BY: DO SCALE: AS NOTED SHEET: 7 OF 7 <br />EVERGREEN TREES <br />PERMIT NO. CHANGE PER DM; <br />FT LUPTON SPECIAL USE <br />DECIDUOUS TREES <br />Q <br />LARGE SHRUBS <br />Bo <br />SMALL SHRUBS <br />DIAMETER <br />2 -3 X'S BALL WIDTH <br />RECLAMATION NOTES: <br />SET SHRUB PLUMB. <br />TOP OF ROOT BALL TO <br />MATCH FINISH GRADE <br />3' DEEP SHREADED CEDAR MULCH <br />INSIDE SAUCER FOR ALL SHRUBS <br />PREPARED BACKFILL MIXTURE: <br />1. ONE PART COMPOST <br />OR APPROVED EQUAL. <br />2. TWO PARTS TOPSOIL. <br />3. THREE PARTS NATIVE SOIL. <br />4. MATERIALS TO BE THOROUGHLY <br />BLENDED. <br />NOT <br />1. REFER TO THE RECLAMATION PLAN MAP (SHEET 6) FOR A GENERAL OVERVIEW OF THE RECLMATION PLAN. <br />ALL PLANTS PROPOSED ON THE MINING PLAN SHALL REMAIN ON THE SITE AND ARE SHOWN ON THE <br />RECLAMATION PLAN. <br />2. ALL PROPOSED LANDSCAPING SHALL BE IRRIGATED WITH AN IRRIGATION SYSTEM. AREAS PLANTED WITH THE <br />SPECIFIED SEED MIX SHALL BE IRRIGATED UNTIL ESTABLISHED. <br />3. ALL TREES SHALL HAVE 3' DIAMETER TREE WELLS. SHRUBS AND TREES TO BE MULCHED WITH WOOD MULCH IN 4' <br />MINIMUM DEEP BEDS TO FACILITATE MOWING UNTIL TREES AND SHRUBS ARE WELL ESTABLISHED. <br />4. LOCATION OF LANDSCAPE MATERIAL WALL BE SUBJECT TO FIELD ADJUSTMENT TO ACCOMMODATE ANY FIXED <br />IMPROVEMENTS AND SI'E CONDITIONS. <br />5. ALL LANDSCAPING SHALL MEET THE UTILITY CLEARANCE REQUIREMENTS. TREES CANNOT BE PLANTED WITHIN 5' OF A <br />UTILITY LINE. <br />6. THE LANDSCAPE CONTRACTOR SHALL CALL FOR ALL UTILITY LOCATES AND FIELD VERIFY THE LOCATION OF ALL <br />UNDERGROUND UTILITIES. <br />7. ALL LANDSCAPE SHALL BE INSTALLED CONSISTENT WITH XERISCAPE STANDARDS FOR INSTALLATION, SOIL PREPARATION <br />AND IRRIGATION. <br />B. ALL SEEDED LANDSCAPE AREAS SHALL BE RESEEDED AS NEEDED UNTIL WELL ESTABLISHED. <br />9. TREES AND SHRUBS PLANTED WITHIN MULCHED BEDS WITHOUT EDGING SHALL BE DRIP IRRIGATED. MULCHED BEDS <br />SHALL NOT BE MAINTAINED ONCE TREES AND SHRUBS HAVE BEEN ESTABLISHED OR BEYOND 5 YEARS. NATIVE <br />GRASSES ARE TO FILL IN AROUND THEM AND REPLACE THE MULCHED BEDS AFTER ESTABLISHMENT. <br />10. ALL TREES AND SHRBS SHALL BE PLANTED AT A MINIMUM OF 20' FROM THE MINING HALL WALL.. <br />11. TREES AND SHRUBS SHALL BE PLANTED AT THE AMOUNTS LISTED ON THE PLANT SCHEDULE. TREES AND SHRUBS <br />SHALL BE CLUSTERED AS SHOWN ON THE PLAN. <br />12. ALL SUSTITUTIONS SHALL BE APPROVED BY LANDSCAPE ARCHITECT PRIOR TO PLANTING. PROPOSED <br />SUBSTITUTIONS MUST BE NATIVE AND SHALL ONLY BE PROPOSED TO ACCOMODATE AVAILABILTY. <br />13. SEEDINGS OF SPECIFIED NATIVE GRASS MIX WALL TAKE PLACE ONCE FINAL GRADING AND REPLACEMENT OF TOPSOIL <br />HAVE BEEN COMPLETED FOR EACH PHASE. <br />14.FORBS SPECIES LISTED IN THE SEED SCHEDULE SHALL BE ADDED TO THE SEED MIX WHEN SEEDING BERMS AND AREAS <br />ADJACENT TO THE TRAILS AND ADJACENT HOMES. <br />15. SEEDING RATES SHALL BE DOUBLED WHEN SEED MIX IS HAND - BROADCAST. <br />16. SEEDING SHALL TAKE PLACE BETWEEN LATE SEPTEMBER AND MID -APRIL TO ASSURE ADEQUATE SITE CONDITIONS FOR <br />GERMINATION. SEEDING SHALL BE DONE IN UN- FROZEN SOIL. <br />17.REVEGETATED AREAS WILL BE MULCHED WITH CLEAN, WEED -FREE STRAW OR NATIVE HAY. HAY SHALL BE APPLIED <br />AT A RATE OF 4,000 IBS /ACRE AND CRIMPED INTO THE SOIL, <br />18. CRIMPING WILL BE DONE ALONG THE CONTOUR. <br />MAR 10 2005 <br />1 -.4 lo... o.. ""I <br />Permit #: 4Yl- <br />Class: i�- Confidental?: A." <br />From: � inl I� , r7 r ATo: <br />Doc. Name. ry r V ?11C <br />Doc. Date (if no gate stamp). C SectioNExh. <br />Inspection Date <br />Specialist: <br />RrLot'j y -Il_t,,,- <br />LUPTON LAKES RESOURCE, <br />FT. LUPTON SPECIAL USE PERMIT AND <br />MLRB 112 RECLAMATION PERMIT M- 2004 -078 <br />RECLAMATION LANDSCAPE <br />SW TKO JOINT VENTURE PARTNERSHIP, LLC <br />NO. <br />REVISIONS <br />DESCRIPTION <br />DATE <br />BY <br />1 <br />REVISIONS PER SW TKO <br />11/9/04 <br />DF <br />2 <br />NAME CHANGE PER DMG <br />2/20/0 <br />DF <br />451 Oak Street, Suite 209 <br />C I V I L R E SOU R C E S, L LC P.O 8 o 14 6 Frederick <br />8330 850 80530 <br />DESIGNED BY: DO JOB NO. DWG: <br />DRAWN BY: ARR /SR DATE: SEPT. 2004 DMG- Revised for Adequacy Response 3 -25 -05 <br />CHECKED BY: DO SCALE: AS NOTED SHEET: 7 OF 7 <br />3 <br />4 <br />PERMIT NO. CHANGE PER DM; <br />FT LUPTON SPECIAL USE <br />1/27/0 <br />3/24/05 <br />OF <br />SR <br />5 <br />DMG ADEQUACY REVIEW <br />3/28/05 <br />KF <br />Permit #: 4Yl- <br />Class: i�- Confidental?: A." <br />From: � inl I� , r7 r ATo: <br />Doc. Name. ry r V ?11C <br />Doc. Date (if no gate stamp). C SectioNExh. <br />Inspection Date <br />Specialist: <br />RrLot'j y -Il_t,,,- <br />