Laserfiche WebLink
NMD (Panels 17 Right through 23 Right) (PR 03-06) <br />The same mining method utilized in the southern half of the NMD will be used to extract coal from the northern <br />half of the NMD. The existing surface facilities, including the EMD ventilation site, will be used for mining of coal <br />in this part of the NMD permit azea. <br />j21 Operation Description <br />(al Surface mining. A detailed narrative description and appropriate map(sl prepared in <br />various mining.phases proposed by the applicant. the maximum acreage proposed for each phase of the operations <br />within the pemilt area must be specified. <br />RESPONSE <br />No surface mining is planned in this application. Therefore, the requirements of this Section aze not applicable to <br />the Foidel Creek operation, nor the Fish Creek Tipple operation <br />(bl Underground mining. A detailed narrative and appropriate man(sl prepared according to the standards of <br />2.10, sufficient to describe all proposed surface disturbances to be associated with the underground mining <br />activities within the permit area. Each operation plan shall include a narrative, cross sections. mapLl, and <br />timetable(sl sufficient to describe the areal extent of the proposed underground workings and the stratum <br /> <br /> <br />MROS-194 2.05-11.1 07/2/05 <br />