Laserfiche WebLink
i f4 r. Patrick iJarren -4- January 10, 1984 <br />5. A plan for reclamation of access roads and other woricjstockpile areas <br />outside of the stream should be provided. <br />o. A specific reclamation plan should be provided for all operations <br />' (typically, access in and out of the stream, and other such disturbances <br />should be considered). <br />Other <br />Responses should include proof of ;nailing (certified receipt cards, or <br />otherwise) notice to all landowners immediately adjacent to the pennit <br />boundaries, and proof of publication (See Rule 3.22 for publication <br />requirements). <br />', Sincerely, <br />~,~~~ <br />Michael Stanton <br />Reclamation Specialist <br />MS/th <br />Doc. No. 8404 <br />