Laserfiche WebLink
• • ~ <br />~~1~ <br />8. Monitoring Reclamation Success <br />Monitoring the reclamation on an ongoing basis will allow minor revisions to assure successful <br />reclamation. The operator plans to use the local SCS office in Huerfano County to assist in deter- <br />mining the perennial cover of the reclaimed land. If minor changes or modifications are needed to <br />the seeding and reclamation plan, revision plans will be submitted to the Division as required. It is <br />hoped that the Division will provide assistance in evaluating the success of the ongoing reclamation <br />process. Ali areas disturbed and reclaimed and any other important items regarding the reclamation <br />will be submitted in the annual reports to the Division. <br />Ferrero Pit 2/00 25 <br />