My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE114643
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE114643
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:10:45 PM
Creation date
11/24/2007 11:53:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Permit File
Doc Date
7/30/2007
Doc Name
Probable Hydrologic Consequences (Formerly Peabody Tab 7)
Section_Exhibit Name
Section 2.05.6(3) Attachment 2.05.6(3)-2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />l TAB 17 <br />PROBABLE NYDROtOCiC CONSE(A)ENCES <br />List of Tables (Cont.) <br />'Tdble No. pace <br />77-13 Su]faie Fluxes at Sites SW-N703 and SW-N101, Their 0lfferences, <br /> and CalGUiated Ground-Water Discharge and Surfaea Runoff Into <br /> Calamity Draw Between the Two Sites 17-54 <br />17-74 A Comparison of Mean Parameter Concentrations in Overburden, <br /> Spoils and Pond 007 Water 17-60 <br />17 -15A Instantaneous Flow, TOS, and Chemical Loading Measurements <br /> Taken at Sel eci Surface Water Monitoring 51tes on 4/3/67 and <br /> 70/Z/B7 17-62 <br />17 -75B Nean Annual Flow, TDS and Chemical Loading Values for Surface <br /> Water Monitoring Sites and Nucls East Spoils 77-63 <br />77-T6 Indi~itlual Computations for Same Day (Irrigation Season) <br />' ]mpact Analyses for Mine Discharges to Tuttle Draw 17-65 <br />• 17-17 Intli vi du al Computati one for Same Day (Non-lrrigation Season) <br /> Impact Analyses for Mine Di scfiarges to Tuttle Draw 17-66 <br />17-18 Indf vi dual Computations for Impact Analyses for Nean <br /> Annual Mine Discharges to Tuttle Draw 17-67 <br />17-19 Lambi ned Effect Of Mine Discharges into Catami ty and Tuttle <br /> Draws on the San Niguel Water puality 77-69 <br />17-20A Effects of Projected Spoil Discharges frm the Nuc7a East <br /> Mining Area an Celami ty Draw Water Quality 17-70 <br />77-TOB Effects of Measu retl Spoil Disehargee From the Nuc1a Mining <br /> Area on Tuttle Draw Water Quality 77-77 <br />17-Z7 A6sumptions Assoeieted with the Water Ou it icy Impact Calculations <br /> Presented fn Tables 77-19, 77-20A snd 17-200 77-72 <br />17-2Z Stream Langtha and Grad7ents oT the West Return Ditch in the <br /> Vicinity of the Nuela Nine for Both Pre- and Poetmining Cvndi ti ons 77-74 <br />17-23 A~erege Water St+ed Slope, Aver aye Watershed Slope Length and Ti7ae <br /> oT ConcentretS on in the 007 Pond Watershed for Both Pra- and <br /> Postmininq Topographies 17-75 <br />iv Revised 04/11/BS <br />• REVISED MARCH 2006 Attachment 2.05.6(3)-2-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.