My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE114594
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE114594
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:10:41 PM
Creation date
11/24/2007 11:50:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 39 PAR 10/17/86 RESPONSES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subsidence Monitoring Program <br />• <br />The applicant references the existing surface subsidence monuments <br />on page 2.05.6(6)-15, and depicts their location on Map No. 31, <br />entitled "Subsidence Monitoring". The new application does not <br />contain any details of monument construction. The applicant should <br />include the_description and drawings contained within the original <br />application documents. These should be utilized to supplement or <br />replace the subsidence monuments in the future. <br />RESPONSE: Page 2.05.6(6)-15 has been revised and Figure 58A has <br />been added to address this issue. <br />The application discusses the initiation and conduct of subsidence <br />monitoring, on page 2.05.6(6)-16. The text states; "additional <br />monitoring points will be installed at least one (1) month prior to <br />• initiation of possible mining-induced subsidence based on the <br />projected 19° angle of draw. Monitoring of monuments shall be <br />performed at least quarterly, commencing one (1) month prior to <br />initiation of mining beneath any established monument or <br />structure." It is desirable to survey a monument or structure at <br />least twice prior to the initiation of subsidence, in order to <br />ascertain whether the monuments are stable and properly installed. <br />This ensures reliable monuments and avoids loss of data. The <br />applicant should amend their text appropriately. <br />RESPONSE: Page 2.05.6(6)-16 has been revised to address this <br />issue. <br />3. The applicant proposes no monitoring plan in relation to the AMOCO <br />Oil Pipeline or Countv Road 107. It is probable that some <br /> monitoring program will be required for these structures, which <br /> will be imp acted during the initial five y ear mine permit. <br /> <br />39-27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.