Rule 2.05.4 Reclamation Plan
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GREG LEWICKI <br />7EL~1-303-629-9335 Rpr__04,92 16 51 No .002 P.02 <br />~ 2.05.4(2}(61 Reclamation Costs (centinuedl <br />This section was added in November of 1995 to account for dclails of certain reclamation <br />items to be completed after Phase 2 bond release. These item:; are discussed in detail on <br />page 183. The approximate reclamation costs for the wot+k arc included below: <br />Item 1) Cut down sediment pond dam and fill in pond. Using-tlte small D-4 size dozer <br />available from the adjacent landowner at a rate of $45/hour, the short push distance <br />downhill of approximately 45 feet to the adjacent pond can be accomplished in 4 hours for <br />e quantity of 149 cubic yards. Therefore, the cost to complett: this item is 4 hrs x $45lhr = <br />$180. <br />Item 2) Excavate topsoil from road and place on filled pond. Again, the pond is adjacent to <br />the road and can be covered with soil in approximately 3.5 hours, using a quantity of 121 <br />cubic yards. Therefore, the cost to complete this item is 3.5 hrs x S45/hr = $}57. <br />ltcm 3) Excavate the east berm and place this material on the access road surface. This <br />~ work will require a small loader, smell truck end a smell dozer to spread and grade the <br />material after placement. Using a rental cost of $45lhr for caclt of the three machines, the <br />((~ breakdown of costs is as follows: <br />1. - <br />Truck/loader: Assuming the truck is of 5 cy capacity, the small loader (bucket ].2 cy) can <br />complete a {oad of the truck in 4.0 minutes. The truck needs 4.5 minutes to deliver the fill <br />to the road and return to the loader, therefore the full cycle time is 8.5 minutes. Since the <br />quantity to be moved is 174 cubic yards, the 35 cycles are needed to complete the work. <br />Time needed is 35 cycles x 8.5 minutes per cycle =approximately 5 hours. Cost for the <br />loadedtruck tandem is $90 hr x 5 hrs = 5450. <br />Dozer: The D-4 dozer will be used to spread and grade the fill/roadbase. Approximately 2.5 <br />hours will be needed for this task. Cost = 2.5 hrs x $45(hr = $112 <br />Item 4) Revegetation. The area to be reseeded after Phase 2 bond release from the tasks <br />described above is approximately 0.31 acres. By broadcasting seed end mulch, the work can <br />be done for a cost of 5300. <br />Total costs for reclamation of the items described above after phase 2 bond release is <br />S1199. <br />`• 185.8 <br />Revised 11/IO/95 <br />?-PYi' <br />