RECLAMATION COSTS <br />EXHIBIT L <br />The worst case reclamation costs occur when the mining is completed on the site and the final <br />phase will need the following: <br />1) backfilling of slopes in the final phase to 3H:1V based on 1650 feet length and 900 sq. ft x- <br />section (from 1:1 to 3:1) = 59,000 cy. <br />2) topsoiling will be needed along the wetland fringe of the final phase and naturals will be placed <br />on the upper slopes of the final two phases. As described in the mining plan, reclamation of <br />previous phases will be an ongoing process during mining, therefore, the reclamation work at the <br />end of mining is lessened. It will also be assumed [hat all areas to be seeded will be done during the <br />Crnal reclamation process although seeding of some areas will take place during the phased process. <br />Worst case reclamation costs for this scenario are given below: <br />Task Description Time Needed Cost <br /># months <br />1 Backfill slopes in final Phase from 1.5 $38940 <br /> 1H:1V to 3H:1V. 59000 cy @ $0.66 <br /> per cy. Get naturals and overburden <br /> from previous phase floor. <br />2 Replace topsoil on 2 phases. Move 0.25 $2088 <br /> from stockpile, spread and final grade <br /> 2400 cubic yards @$0.87 per cy <br />3 Regrade sediment pond. 1000 cy 0.2 $460 <br /> @$0.46 per cy <br />Gilsonite Pit 10/02 33 <br />