6. RECLAMATION TIMETABLE <br />Since mining of the phased areas is concurrent with reclamation, the timetable is somewhat tied to <br />the rate of mining in this azea. Since actual sales are difficult to predict, the assumption will be <br />made that the operation will mine and se11200,000 tons of total product per year, on an average. <br />The timetable in the mining plan also reflects these rates. The expected reclamation timetable is <br />given below: <br />RECLAMATION TIMETABLE <br />Task <br /># Description Time Needed <br />months <br />1 Backfill slopes in Phase 1 pit from 1 H:1 V to 3H:1 V using naturals <br />from Phase 1 mining and overburden from Phase 2. 1 <br />2 For Phases 2,3,4,5, move overburden to reclaim previous phases <br />prior to mining. Ongoing reseeding and mulching of these strips. 112 <br />3 Use naturals and overburden placed in the bottom of previous phases <br />to backfill the fmal phase. Total of 59,000 cubic yards 1 <br />4 Use topsoil from stockpile to place neaz water level of last 2 phases. <br />Total of 2400 cubic yazds .5 <br />5 Move all portable equipment offsite. 0.2 <br />6 Regrade sediment pond. 0.2 <br />7 Ripping or harrowing of any needed azeas. 20 Acres 0.2 <br />8 Reseed and mulch all Phases (except below water), staging area, <br />stockpile area and sediment pond. Total azea = 25 acres 0.2 <br /> <br /> Total Time 115.3 <br />Gilsonite Pit 10/02 20 <br />