Laserfiche WebLink
05r19i97 19:YJ '®'SD~ 289 1546 <br />L.G. EVERIS~, IIVC. <br />May l2, 1997 <br />Mr. Btvice Fumphries <br />Manager, Construction Materials Division <br />Division of Mitterals and Geology <br />1313 Sherman SVeet, #215 <br />Denver, Colorado 80203 <br />Re: #M-96-049, Maryland Creek Ranch l 12 Pemrit <br />Dear Mr. Humphries: <br />1 / l <br />Confirming our recent phone conversation, we are in the process of stripping topsoil and <br />overburden on the rt~Setenced permit. We are encountering a considerable amoum of topsoil and are <br />planning to use the amount .ve do not need fnr reclamation on the remaining S00 acres of the ranch. <br />This material will be incorporated into an off-site hillside adjacent to the west side of the <br />permitted area, against the toe of a 60' slope. We will protect against runoff with a silt fence and seed <br />this stockpile as soon as practicable. We arrticipaze moving this inateri[il ut the near future as the <br />ranch development progresses. It is our understanding that this operation does not violate any <br />conditions of the peter' <br />have any questions, <br />~~, <br />'fU,/ <br />please feel free to call. <br />R. A. Ev~~t <br />Vice President <br />LG EYERIST III IIIIIIIIIIIIIIII J001/001 <br />999 <br />S. AMLLIP$ <br />a.0. BO% SB7D <br />SIOUX FnLL6, SDUTH O!V(OT~ ~7~17 <br />505-33.5000 <br />FA%605.3343655 <br />MOUNi41N Dlvlel[N <br />9os50UWGE 6rf~f <br />'~~ HEAmERSON, COLOMDD EOMG <br />70]d87~G56 <br />[[[ypiSB?136[ <br />cc: DES <br />DLF <br />