Laserfiche WebLink
~.. ?, ~, ~.. ~..s1 <br />. ~ <br />EXHIBTT E <br />. ~ . ,JdO <br />PIi4v~i.~ :.. ,... ~ : ,, .. i:^ f <br />RECLAMATION PLAN - MONTOYA PIY°~o. De;;: _ . ,.~~,u. rces <br />The land around the Montoya Pit is rangeland. The <br />Montoya Pit when finished will be changed back to rangeland. <br />Because of the surrounding topography, preparation of <br />slopes for drainage purposes should not be a problem. <br />Grading and sloping will be accomplished so as to best <br />prevent any erosion of soils and care will be taken while <br />shaping slopes to create diversions so teat excess water <br />above the site will not be allowed to flow onto or across <br />the site. <br />Slopes in the pit will be shaped by a crawler type <br />tractor equipped with a dozer blade, These slopes will <br />be shaped with a maximum slope of 3;1 where possible. <br />Areas steeper than 3:1 shall be kept at a minimum. <br />All available topsoil at tr:e site will be spread on <br />the affected area to compliment seeding proceedures. ~eedina <br />plans, including types, mixtures, quantities, mulching, and <br />expected times of seeding, shall follow the guide sheet <br />prepared by the Soil Conservation Service except that if <br />the county decides to broadcast seed the affected area, the <br />rates recommended for the drilling method will be doubled. <br />If the hI.L.R.B. staff believes the seeding mixture should <br />be changed to provide a more feasible revegetation scheme, <br />C & J will cooperate as much a possible, <br />C & J will reclaim the access road the same as the <br />pit area. <br />C & J Gravel will begin reclamation proceedures of tt!e <br />disturbed lands at this pit when the lease is not reneged <br />or when it is determined that the gravel source is depleted, <br />whichever comes first. <br />In most areas there will be 10' to 12', inches, of <br />topsoil and in the other areas 2' to 5' inches. <br />