Laserfiche WebLink
<br />EXHIBIT C- MINING PLAN CONTINUED <br />(H) ONLY WATER USED WILL BE ON ROAD FOR DUST CONTROL. <br />PURCHASED IN PENROSE OR FLORENCE, COLORADO. <br />(I) STORM WATER RUN-OFF WILL NOT BE DISTURBED OR CHANGED <br />FROM IT'S NATURAL COURSE, IT'S POSSIBLE THAT SOME RIP-RAP <br />COULD BE USED TO CONTROL ANY ADDITIONAL EROSION THAT THE <br />MINING MIGHT CAUSE. <br />{J) N!A <br />(K) N/A <br />(L) SURFACE MINING GIVES THE CONTROL NEEDED TO MINIMIZE ANY <br />DISTURBANCES, ON THE SITE OR OFF SITE AND ALLOWS OPERATOR <br />TO MAINTAIN A CONFIGURATION CONSISTENT WITH PROPOSED LAND <br />USE IN FUTURE. <br />(M) PROCESSING, ON SITE WILL CONSIST OF SCREENING AND <br />GRUSHING <br />(N) PRIMARY COMMODITIES ARE GYPSUM AND DE-COMPOSED GYPSUM, <br />THESE WILL BE USED IN SOIL ENHANCEMENT. <br />(2) NO TAILING PONDS WILL BE USED 1N THE PROCESSING OF MATERIAL, IT IS <br />A DRY OPERATION. <br />RECEiv~r~ <br />AUG 2 9 1991 <br />Division of Mine~ais a ueoiogy <br />