Laserfiche WebLink
COLORADO WESTMORELAND INC. <br />• <br />STANDARD PROCEDURES MANUAL <br />PROCEDURE NUMBER <br />PAGE g OF ~p PAGES <br />EFFECTIVE DATE / /19 <br />APPROVED ~ pQ t1.7. ~~_~Q..' __._. <br />Signature of CW GENERAL MANAGER <br />SUBJECT FIRE LOSS PREVENTION POLICY <br />bi-monthly to monthly. Although the number of under- <br />ground extinguishers varies, the surface extinguishers <br />are kept at specific locations. <br />The inventory of surface extinguishers as well as the <br />location of spares will be included in the fire brigade <br />manual. <br />B. Hose Houses and Components <br />After each hydrant in the mine area has been raised and <br />/~ the metal houses installed, a weekly inspection and in- <br />l ventory will be conducted by the safety technicians. <br />The post indicator valves will also be checked.: <br />C. Self-contained Breathing Apparatuses <br />After completion of the new bathhouse, all emergency <br />equipment will be stored in or nearby our emergency ve- <br />hicle. Standard safety technician inspections and in- <br />ventory procedures will be used. <br />D. Emergency Vehicle <br />After completion of the new bathhouse, all emergency <br />equipment will be stored in or nearby our emergency ve- <br />hicle. Standard safety technician inspections and in- <br />ventory procedures will be used. <br />E. Weekly Fire Suppression System Inspection <br />This inspection will be completed by the surface pro- <br />duction crew mechanic or electrician. The following <br />items will be checked. <br /> 1. Starting of the fire pump <br /> 2. Check of resevoir levels <br />