Laserfiche WebLink
RULE 6.34.(2) EXHIBIT "D" <br />RECLAMATION COST <br />AZCO PIT <br /> QTY. UNIT UNIT COST <br />1.) REDUCE REMAINING HIGH WAIL 1 LS $1,250.00 <br />2.) REPLACE OVERBURDEN 2000 LCY $1.05 <br />3.) PLACE TOPSOIL OVER AREA 5625 LCY $1.05 <br />4.) SCARIFY THE HARD PAN 1.5 ACRE $250.00 <br />5.) SEED BED PREPARATION 6 ACRE $125.00 <br />6.) FERTILIZER APPLICATION 0 ACRE $0.00 <br />7.) SEEDING BROADCAST METHOD DOUBLE THE RATE W j LABOR & EQUIP. 6 ACRE $288.00 <br />8.) MULCHING W/ HAY OR STRAW 4.5 ACRE ;165.00 <br />9.) WEED CONTROL ALLOWANCE 2.7 ACRE $35.00 <br />10.) MOBILIZATION & DEMOBILIZATION 2 EA. $750.00 <br />TOTAL DIRECT COST <br />INDIRECT COST <br />PUBLIC LIABILITY INSURANCE 1.55% <br />CONTRACTOR PERFORMANCE BOND COST 1.55% <br />CONTRACTOR PROFI'i 1D.00% <br />DMSION OF MINERALS & GEOLOGY ADMIN. EXPENSE 5.00% <br />ADDITIONAL SUPERVISION 3.00% <br />TOTAL PERFORMANCE BOND AMOUNT <br />COST PER ACRE 8.86 <br />EXTENDED <br />COST <br />$1,250 <br />$2,100 <br />$5,906 <br />$375 <br />$750 <br />$0 <br />$1,728 <br />$743 <br />$95 <br />$1,500 <br />$14,446 <br />$223.92 <br />$223.92 <br />$1,444.63 <br />$722.31 <br />$433.39 <br />$17,494 <br />$1,975 <br />