Laserfiche WebLink
!.-, .~ <br />III) EXHIBIT "D" RECLAMATION PLAN <br />A) I agree with you that the total growth medium that I stated in Exhibit "C" <br />was 15 inches thick. The operator will therefore commit to place the growth <br />medium back at a rate of between 6 inches - 15 inches with and average of <br />12 inches through out the affected azeas. <br />B) I have enclosed a noxious weed control plan as you requested. The <br />operator/ applicant will implement the plan as part of the permit <br />requirements. This plan is for the entire permit area and the goal is to have <br />a good rangeland azea to be used for grazing. <br />C) The financial warranty calculation has been recalculated for the affected <br />azea. The new figure has been increased to account for the additional <br />earthwork needed to replace the extra growth medium. Some other minor <br />adjustments have also been made to better approximate the actual <br />conditions that could possibly exist when reclamation is commenced. The <br />estimated cost to bond this site now stands at $ 17,500.00. Using 8.86 <br />acres as the new permit azea, less the road now would make the cost per <br />acre at $ 1,975.00/acre. <br />If you have any questions please call me at 719-240-9424 or fax me at 719-583-0768. <br />incerely/, <br />v(~Vtly <br />oe Gaglian <br />Consultant <br />Enclosures: (2) Two copies of the Mining Map <br />(2) Two copies of the Reclamation Map <br />(2) Two copies of the Revised Reclamation Cost EXHIBIT "D" <br />(2) Two copies of the Pit Permit Boundary EXHIBIT "A" <br />(2) Two copies of the Noxious Weed Control and Management Plan <br />cc: file <br />AZCO CONSTRUCTION <br />