Laserfiche WebLink
• <br />• <br />RECLAMATION TIME TABLES <br />Activity Time Period <br />1) Dismantling surface facilities, <br /> sale of salvaged equipment and <br /> coal stockpiles, backfilling <br /> and sealing of mine portals. 10 weeks <br />2) Regrading of the permit azea <br /> (10.88 acres) 3 weeks <br />3) Top soil dispersement, <br /> compacting, roughing 2 weeks <br />4) Seeding and mulching 3 weeks <br />5) Erosion control, inspection <br /> and maintenance of diversion <br /> channels On-going <br />6) Re-seeding after spring runoff <br /> (if necessary), removal of <br /> diversion channels 2 weeps <br />RECLAMATION COSTS <br />r. <br />Reclamation costs have been detailed in Appendix 9. <br />A copy of this bona is on file with the Division of Minerals and Geology. <br />2.05.4 page 7 <br />January 1998 <br />