Laserfiche WebLink
~ III IIIIIIIIIIIIIIII ~ <br />Gxhibit A - Legal Descr~tion ggg <br />The ley;al description of tl~e proposed affcc~CCd irons given to Che nearest trnanship, <br />range and quarter, quarter section is:___-__`___-____ - <br />Gxhibit 6 -Mining Plan <br />I. Topsoil will be stripped to a depth orQ'p/}~.~ inches rend stockpiled in [lie <br />area shown on Gxhibit Cl map hclcnJ. , <br />2, If overburden is [n he removed to rcar.h the r;ravcl dcposil,-~Q(Y€ <br />feet will be removed, sef;regated from the Copsoil. and sCOCkpiled in the <br />area shown on Iixhibit CI map bi•luw. <br />3. Gravel will be mined [o a maximum depth oC_ ___~ ____fceC from the p,round <br />surface, and in the direction as shown by an arrow on Exhibit (:l m;~p belcna. <br />4. The followinf; Cypes of. equipment will be used to mine tlce deposit: <br />5. The following types of fixed eyuil-~ment will be used to process Che grovel <br />on site: <br />~lY~__------ --- ----- -- - <br /> <br />and will be located as shown on G};hibit c;l map be]ow. <br />6. The operation will begin on _ and will be <br />-------(date)-- - <br />completed by__ _ _ ____ <br />(appror,imate date) <br />7. IE ground water is [o be encountered during mininp•„ describe the proposed <br />dewatering and sediment-crmtainment system:Jj/oNF ___ _ __ <br />(This system may also be shown nn the Gxhibit C] neap) <br />8. As necessary, describe in detail measures which will. be taE:en to control <br />drainal;c and sediment in vnl around this sitc:~QlY_,~,_-_ <br /> <br />(Diversions may also be shown on the Gxhibit C.l map) <br />