Laserfiche WebLink
o. That d the ecbvity au thorned herein~ot nei lee ail el Eelele eel • r.:~~ <br />completed on OI before <br />day of , 19 (three years from [he date of issuance of this permit unless otherwise specificdl the permit, it <br />nut previously revoked or spetdicelly eetended, shsll automatically ¢apirp. <br />p. Thps that permit does no[ aulhorite or approve the conitrut Lion of pert i[ular structures, the authoritarian or approval of which <br />may require au ihori:ation by the Congress or other agencies of the federal Government. <br />q. That tf antl when she permi[tea destsea to aWndon the activity euthori:etl herein, unless such abandonment is pert of a trpnsler <br />procedure bV which [he permit tee it transferring his interests herein to s third party pursuant to General Condition t hereof, he must <br />restore the area to a condition sahsfactory ro the Dutrin Engineer. <br />r. Thal d the recording of this permi( is possible under applicable State or local law, the permitted shall take such action of may 6e <br />necessary to record this permit with the Register of Deeds or other appropriate official charged with the responsibility for maintaining <br />records of tale to end interests in real property. <br />t. Thal this permit may not be transferred to a third party without prior mitten notice ro the District Engineer, either by the <br />transferee's warren agreement to comply with all terms and conditions of this permi[ or 6y the transferee subscribing to this permit in <br />tM: space prontled below and thereby agreeing to comply with ell terms and Cpnditrpns of this per mgt. In etltlition, if the perm~tlea <br />translnrs thu interests aurhor~tesl herein by convevanca of realty, the tleed shall reference This permit and tnp terms antl conditions <br />sp:crlied herrin antl this permit shall tlr recorded along with [he tleed with the Register of Deeds or other appropriate pllicial. <br />11. Special Condrtiona: (Here hs[ conditions relating specJicelly ro the proposed structure or work au rhori:etl by ihq permnl: <br />a. That all construction debris will be disposed of on land in such a manner <br />that it cannot enter into the waterway. <br />b. That equipment for handling and conveying materials during construction <br />shall be operated to prevent dumping or spilling the materials into the. water <br />except as approved herein. <br />,- <br />c. That care will be taken to prevent any petrole~nn products, chemicals, or <br />other deleterious materials from entering the water. <br />d. That all work in the waterway is performed in such a manner so as to <br />minimize increases in suspended solids and turbidity which may degrade water quality <br />and damage aquatic life outside the immediate area of operation. <br />e. That all areas along the bank disturbed or newly created by the construc- <br />tion activity, will be seeded with vegetation indigenous to the area for protection <br />against subsequent erosion. , <br />4. That the clearing of vegetation will be limited to that which is absolutely <br />necessary for construction of the project. <br />g. That close coordination will be maintained with downstream water users, <br />advising them of any water quality changes to be caused by the constnution. <br />h. That all dredged or excavated materials, with the exception of that <br />authorized herein, will be placed on an upland site above the ordinary high water <br />line in a confined area, not classified as a wetland, to prevent the return of <br />such materials to the watenaay. <br />i. That all earthwork operations on shore will be carried out in such a manner <br />that sediment rlutoff and soil erosion to the water are controlled. <br />j. That the use of machinery" >n the waterway will be kept to a minimum. <br />(Special Condition continued on page 5)_ , <br />3 <br />