Laserfiche WebLink
• <br />• <br />• <br />Surface Subsidence Control Plan <br />Peerless Resources, Inc. does not expect any adverse effects by <br />potential subsidence as a result of the of pillar extraction upon <br />retreat and the leaving of barrier support pillars. Consequently, no <br />measures will be taken on the surface with respect to subsidence <br />control. <br />2.05-47 <br />