Laserfiche WebLink
ations Plan - Rule 2.05 <br />1. The applicant needs to address the resource recovery requirements <br />• in terms of the overlying B and C Coal Seams. <br />RESPONSE: <br />~ At the present time, Peerless Resources, Inc. has no plans for mining <br />the B and C Coal Seams within the first five (5) years of mining. <br />Peerless Resources, Inc. currently believes that the B Coal Seam is too <br />thin to be economically or physically recovered by underground mining <br />operations. Mining of the overlying C Coal Seam is a possibility, but <br />Peerless Resources, Inc. needs to complete additional feasibility <br />studies before committing to extract the C Coal Seam; before any mining <br />of the overlying C Coal Seam, Peerless Resources, Inc. will file the <br />necessary revisions and will obtain the proper approvals from the <br />Division. <br />C~ <br />• <br />Peerless Resources, Inc. should emphasize that, if there is coal that is <br />economically mineable and physically recoverable within the permit area, <br />the company will make every effort to mine this coal and minimize any <br />future disturbance caused by mining. <br /> <br /> <br />2. us- 2A <br /> <br />