My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE114242
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE114242
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:10:23 PM
Creation date
11/24/2007 11:24:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984067
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
2.05 OPERATING AND RECLAMATION PLANS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
meets the applicable federal and State of Colorado water quality <br />requirements. Upon removal of the sediment pond and diversion ditches, <br />the affected land will be regraded and revegetated in a manner similar <br />to the proposed revegetation plan described below. <br />Mine Facilities. At the completion of mining operations, the portal <br />complexes, the office and shop structures, the coal crushing and <br />handling facilities, and other related surface facilities will be <br />removed. The sites will then be graded and revegetated in accordance <br />with the procedures set forth in this Section, providing that there are <br />no continuing beneficial uses for these structures. <br />At the conclusion of mining, all salvageable mining equipment will be <br />sold as used equipment or sold to a local scrap dealer. No mining <br />machinery will be merely abandoned by Peerless Resources. <br />The portal facilities in the operations will be completely removed at <br />• the conclusion of mining. The conveyors used to transport the coal from <br />the mine portals to the crusher to the load-out area will be salvaged; <br />the conveyor structure supports will be removed and the right-of-ways <br />will be regraded, if necessary. They will be revegetated in accordance <br />with the revegetation plan set forth later in this Section. <br />The facilities found on the surface, including the office and shop <br />buildings, will be completely removed following mining activities, <br />providing they have no continuing beneficial uses. Materials resulting <br />from this removal will either be sold to a local scrap dealer or hauled <br />from the permit area to a suitable dump site. The areas will then be <br />regraded and revegetated. The access road to the portal area will be <br />revegetated at the conclusion of mining activities. The access road, <br />when no longer needed for operations, reclamation, or environmental <br />monitoring, will be restored. The roadbed will be rounded and shaped to <br />conform with the adjacent terrain and to meet natural drainage <br />restoration standards. At the completion of this regrading, <br />• revegetation will commence. <br />2.05-26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.