Exhibits 12-i, Operations Plan, and 13-1, Facilities Map, show the proposed location of these <br />structures in the facilities area. • <br />Waste Water. Waste water and sewage will be disposed of by septic systems. The bathhouse <br />building will have a septic tank and leach field located southwest of the building. All permits or <br />written waivers will be submitted to the Division from the appropriate regulatory agencies prior to <br />construction of the septic system. <br />Domestic Water. A water well will be drilled in the yard area northwest of the bathhouse building as <br />shown on Exhibits 12-1, Operations Plan, and 13-1, Facilities Map, Well specifics are detailed in Tab <br />7, Hydrologic Description. <br />Solid Wastes. Solid waste will be collected in dumpsters or other suitable containers and disposed of <br />at an approved dump site off the mine property. <br />Explosive Storage. The explosives storage area will be located at the very south end of the facilities <br />area. At this location, as shown on Exhibits 12-1, Operations Plan, and 13-1, Facilities Map, explosive <br />materials will be stored in drop trailers or in approved skid-mounted explosive magazines. The <br />ammonium-nitrate fuel oil mixture IANFOI explosive will be stored in two above ground bulk storage <br />silo bins. Explosive storage magazines will be constructed and located according to State and Federal <br />regulations. No permanent buildings will be constructed. <br />Fuel Storage. Storage tanks for diesel fuel and gasoline will be located in the facilities area near the <br />shop building Isee Exhibits 12-1, Operations Plan, and 13-1, Facilities Mapl. The diesel and gasoline <br />tanks will have a storage capacity of 20,000 gallons and 5,000 gallons, respectively. Spill prevention <br />and containment measures will be implemented in accordance with Seneca's Spill Prevention Control <br />and Countermeasure (SPCC) Plan. <br />Power Transmission. Anew 69KV power transmission line was constructed to the Yoast Mine. A <br />substation will be constructed. The above line will be permitted and constructed by Yampa Valley <br />Electric Association and will come into the mining area from the east edge of the permit boundary near <br />Sedimentation Pond 011. The substation will step down the incoming 69KV line to 4160V to suit the <br />needs of the shop and dragline. Powerlines will be built by Seneca Coal Company from the main <br />substation to the office/shop building and to the reserve areas, as needed. The location of the main <br />electrical facilities are shown on Exhibits 12-1, Operations Plan, and 13-1, Facilities Map <br />Equipment Erection Site. An equipment construction site, mainly for the erection of the <br />32 fievised 06/25/96 <br />