Laserfiche WebLink
SENECA II-W <br /> LIST OF E%HIBITS <br /> (Continued) <br />• Rule No <br />~ Exhib i[ No Title Vplume <br /> . . <br /> 2.04.10 30-1 Premining Vegetation Types and Sample <br /> Location Map 6 <br /> 10-2 Pre-Disturbance Vegetation Types, TAHR 6 <br /> 10-3 Pre-Mining Vegetation Types i sample Location <br /> Map, II-W South 6 <br /> 2.04.11 11-1 Big Came Aerial Census Observations fi <br /> 11-2 Wildlife Sampling Locations 6 <br /> 11-3 Seneca IL-W South Rxteneion 1997 Raptor Hest <br /> Location 6 <br /> 2.05.3 12-1 Seneca II, Yoast and Seneca II-W Coal <br /> Resource Azeas 7 <br /> 2.05.3(2) 12-2 Operations Plan 7 <br /> 13-3 Opera tiona Plan IZ-W L.O.M. 7 <br /> 2.05.313) 13-1 Facilities Map B <br /> 2.05.3 (d) 13-2 Surface Hydrology Map 8 <br /> 13-2A Surface Hydrology 8 <br /> 13-3 Surface Water Control Plan Tie-ACr096 Haul Road 8 <br /> 13-9 Watershed Boundary (Partial) B <br /> 13-8 Proposed Pond 005 B <br /> 13-6A Pond 005 As-Built 8 <br /> 11-6 Poad 006 Phase II As-Built B <br /> 13-6A Pond 006 Phase Iv 9ubraterehad Nap H <br />• 13-6H <br />13-6C Pond 006 Phase IV Design <br />Pond 006 Phase IV Pre-eettl ing Basin Design e <br />H <br /> 13-7 Proposed Sedimentation Pond 009 B <br /> 13-7A Sedimentation Pond 009 A9-Built B <br /> 33-8 Pond 015 Design i Watershed Mape, Shea[s 1 and 2 <br /> oL 2 9 <br /> 13-BA Pond 016 Design i Watershed Mape, Sheets 1 and 1 <br /> oL 1 9 <br /> 13-8H pond 017 Design i Watershed Maps, Shasta 1 and 1 <br /> of 1 9 <br /> 13-8 PP Topsoil Stockpile PP Sumps PP-S1 and <br /> PP-S2 (A9-Built) 9 <br /> 13-BQQ topsoil Stockpile OQ Sump QQ-S1 (A9-Built) 9 <br /> 13-ERR Topsoil Stockpile RR Sump RR-S1 (AS-BUiltl 9 <br /> 2.05.3(3) 13-10 Typical Road Details 9 <br /> 13-11.1 TAHR (AS-BUiltl 9 <br /> 13-11.2 TAHR IAS-Built) 9 <br /> 13-11.3 TAHR (A9-Built) 9 <br /> 13-11.4 TAHR IAS-Built) 9 <br /> 13-11-5 TAHR (Ae-Built) 9 <br /> 13-11.6 TANK (A9-Built) 9 <br /> 13-11.7 TAHR IAS-BUiltl 9 <br /> 13-11.H TAHR (AS-BUil[) 9 <br /> 13-12.1 Mine Entrance Haul Road (As-Built) 9 <br /> 13-12.2 Mine Entrance Haul Road (A9-Built) 9 <br /> 13-12.3 Mine Entrance Haul Road (As-BUil[) 9 <br /> 13-12.4 Mine Entrance Haul Road (As-Built) 9 <br /> 1]-13.1 Haul Road A (A9-Built) 9 <br /> 13-13.2 Haul Road A (As-Built) 9 <br /> 13-13.3 Haul Road A (AS-BUiltl 9 <br /> 13-13.4 Haul Road A (AS-BUiltl 9 <br /> 13-13.5 Haul Road A (AS-BU ilU 9 <br /> 13-14.1 Plan 6 Profile, Haul Road B 10 <br /> 13-14.2 Plan i Profile, Haul Road B 10 <br />• 13-14.3 Plan 6 Prpf ile. Haul Road B 10 <br />3 Reviead O6/00 <br />