Laserfiche WebLink
. The (Buffalo Stone Quarry) mine is located in a very wildlife diverse area, and marry <br />game and non-game species (identified in the CDOW letter) likely occur or occurred <br />there. Some of these species are: Mule Deer, A'hite Tailed Deer, Pronghorn Antelope, <br />Swift Fox, Coyote, Bobcat, Mountain Lion, Black Bear, Mountain Cottontail, Jack <br />Rabbit, Scaled Quail, Northern Harrier, Red-Tailed Hawk, Ferruginous Hawk, <br />American Kestrel ,Mountain Blue-Bird, Plateau Lizard, Great Plains Skink, Western <br />Rattlesnake, Night Snake, and Texas Horned Lizard. It is unlikely that arty threatened <br />or endangered species were/is at the site. The mine's impact to wildlife are likely to be <br />minimal. <br />Reclamation of the site will follow local N.R.C.S. guidelines, as also <br />recommended in the CDOW Letter. Please see Attachment 5 page 14, for the <br />recommended revegetation species list and husbandry guidelines provided by the local <br />N.RC.S. Conservationist. <br />Shrub establishment will not be attempted on the areas to be revegetated. The azea is <br />grazed by livestock, and shrub establishment is not considered viable. <br />6.3.3 EXHIBIT C -Mining Plan <br />La) Duration <br />Operation is anticipated to start in the fall of 2007 and continue for the life of the <br />• quarry. Regazding intermittent operation, quarrying and processing will occur <br />intermittently with processed material stockpiled for later sale. It is doubtful that <br />production would be temporarily ceased for 180 or more days during the life of <br />the mine. In the future, should production cessation be anticipated to last for 180 <br />days or more, a plan addressing that cessation would be filed with the Mined Land <br />Reclamation Board as specified in C.R.S. 34-32.5(11)(b). <br />(bl Soil Salvage <br />The in-place thin surface soil (plant growth medium) vanes from 0 inches to 14 <br />inches in depth across the quarry site. This plant growth medium with included <br />herbaceous vegetation and loose rock shall be stripped from each quarrying area <br />prior to disturbance. The initial plant growth medium will be placed in a stockpile <br />for post-mining reclamation. Subsequent soil salvaged from areas pre-disturbance <br />will be either added to the stockpile or used in concurrent revegetation efforts in <br />mined-out portions of the affected area. Earthwork is relatively minimal due to the <br />shallow soils at the site. <br />(cl Waste Rock <br />No waste rock will be developed in the extraction of the limestone as there is no <br />overburden or interburden associated with the deposits. Chopper fines (limestone <br />from gravel size to several inches across) will be created; however, these fines, if <br />not sold, will be distributed across the quarry floor and covered with the salvaged <br />. plant growth medium for reclamation. <br />