My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE114051
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE114051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:10:13 PM
Creation date
11/24/2007 11:15:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004078
IBM Index Class Name
Permit File
Doc Date
4/21/2005
Doc Name
Reclamation Cost Estimate
From
DMG
To
SW TKO Joint Venture LLC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatlnp Software <br />PUMPING WORK <br />Task no.: 001 State Cobrado PermiUjob no.: Ai-2004-078 <br />Date 04/19/2005 County :Weld Abbreviation none <br />User ESC Site:fupfon fakes Resources Filename M078-001 <br />Agency or organization namoOMG <br />Pormlt or other Job action :Now 117 AppHratrnn <br />Task descnption Pump water Irom pit to /acJNtate construction of the clay liner <br /> <br />HOURLY EQUIPMENT COST <br /> Data <br />IDescrlphon Quantity Source <br /> <br />Pump iCvntrifupel pump, 6.0 rn. _ <br />2 ~ (CRG) <br />Sur:tion hose :Suction hose. 6 in diem., 25 K f 4 (CRG) <br />Discharge hose Dischurge hwe, 61n D, 2S ff L 4 fCRG) <br />Labor NA 0 NA <br />~o~ Broakdaryn : ,lob Utilization <br />Ownership cosUhour : $10 00 NA Joh shift basis : i per day <br />Opemang cost/hour : $17 56 J00 'y„ Horsepower : 65 <br />Operator wst/hour _ 50.00 NA Wuighl(UST): 105 <br />Total cosUlwur : 527.56 <br />Total fleet cosUhour 527.56 <br />PUMPING QUANTITIES <br />Ini6ai pond Conversion Final pond <br />volume 1,2.50,00 acraleef lector: 325,8505800 volume: 407,313,2?5 gallons <br />Total pond ingow surface Unit Inllow rote in Total pond inllow volume <br />area 6,000 sq. it. gph/sq. It.: 0.1758 per hour : (,054.80 gph <br />Soun:e of volun,c estimate : DMG Estimate <br />PUMPING TIME <br />I~ated pump capacity : 90,000 gphfpump Total pumping capacity : 180,000 gph <br />Inlhal unadjusted pumpmg limo : 2,262 85 hours <br />Inllow as y~ of pond volume : NA °~ Inflow during indial pumpmg limi 2.386,8.55 gallons <br />Not unadjusted pumping limo . 2,276 1l hours <br />PumpeKciencyfaclor 0.9(67 (55 minpv) <br />Total adjusted pumping time : 2,482.94 hours <br />JOB TIME AND COST <br />Total job lima : 2482.94 hours <br />Unit atsl : $0.000167 per gallon Total job cost : 568,433 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.