Laserfiche WebLink
• 1,Y: V1US111'L U1~' (.NILWJNS <br />7.05.3 Overburden <br />(6) <br />7.05.3 Coal Randling Structures <br />(7) <br />1.05.3 Coal P=veessinq waste <br />(8) and Non-Coal Processing <br /> waste <br />2.05.3 Underground Development <br />(9) waste <br />7.05.3 Return of Coal Processing <br />(10) Waste to Abandoned Workings <br />2.05.4 Reclamation Plan: <br />2.05.3 Timetables <br />(7) (a) <br />• 7.05.4 Reclamation Cost Estimates <br />(7) (b1 <br />2.05.4 Baekfilling and Grading <br />(?) (c) <br />2.05.4 Topsoil (Redistribution) <br />(z) (a) <br />7.OS.Q Revegetation <br />(7) (e) <br />7.05.4 Disposal of Debris, Acid- <br />(7) (f) Forming and Toxic-Forming <br />Materials <br />7.05.4 Sealing or .Managing wine <br />(7)(g) Openings, Exploration <br />doles, Other Boreholes or <br />• we11s <br />2.05-16 <br />2.05-20 <br />2.05-21 <br />2.05-21 <br />2.05-21 <br />2.05-21 <br />2.05-23 <br />2.05-23 <br />2.05-24 'POS~-wining co mgraphy <br />,2.05.4 (7)(c) <br />Map No. 23, No. 24 <br />& No. 25 <br />2.05-25 <br />2.05-27 <br />2.05-30 <br />2.05-31 <br />