My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE113911
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE113911
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:10:05 PM
Creation date
11/24/2007 11:06:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977071
IBM Index Class Name
Permit File
Doc Date
5/23/1977
From
KASLER CORP
To
DNR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• I III III III IIIIIII III • <br />~as~er ~ior~porafcon t-~ECEIVED <br />~J (~ l~ c // MAY 2 3 1977 ~,©~ <br />.L'~. ~ ~ OOOOOS ~ JOnS~ JIZC. FECLAMATION SECTION ~'^~'~ <br />uD;O. Dept, Of Nafutal Resm:rrae <br />2]600 EAST FIF iH STREET <br />P. O. BO% 3B] <br />SPN 9ERN hRDINO CdLIFORNIA 92000 <br />TELEPHONE lld BB6~0Bl1 <br />TW% 910 332 1231 <br />State of Colorado <br />Department of Natural Resources <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Attn: Jame L. Schmieding <br />Sir: <br />ENGINEERING CONTRACTORS <br />Please reply to: <br />P.O. Box 1240 <br />Leadville, Colorado 80461 <br />May 20, 197 <br />This letter is to explain the necessity for the use of the bedding <br />material and the urgency for the beginning of production of same. <br />The specifications for our contract with the Bureau of Reclamation <br />for the Mt. Elbert Conduit requires the use of a mineral aggregate <br />graded especially for a specific use as a bedding surrounding the <br />90" conduit. The bedding is placed around the perimeter of the <br />pipe to a height equal to 70% of it's diameter. The purpose of <br />this special bedding is to protect and support the delicate pipe. <br />The pipe 90" in diameter is coated on the inside with 2" of mortor <br />and on the outside with 3/4" of mortar, the pipe itself is approxi- <br />mately 7/16" thick. The large size of the pipe with the very thin <br />wall requires careful handling, thus the reason for the selected <br />material to surround it with and support it. The specification's <br />require that the pipe be completely covered within 7 days of it's <br />being placed. Our schedule dictates the placing of pipe beginning <br />6-13-7']. The material site for the bedding material has to be pre- <br />pared and equipment set up to produce same leaving us very little <br />time to produce the material before it'is needed the second week <br />in June. <br />Very truly yours, <br />KASLER CORPORATION & <br />L.H. ~l~ ODS & S'~ INC. <br />C C a r~l lW/ . ' C /H a/n /e y <br />Superintendent <br />CWH/kk <br />
The URL can be used to link to this page
Your browser does not support the video tag.