My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE113898
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE113898
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:10:04 PM
Creation date
11/24/2007 11:06:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
3/20/2006
Section_Exhibit Name
Exhibit 28 Bond Calculations ā(TR48)ā
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />I⢠<br />Task # : 022 State :Colorado Permitlob # : G1981-012 <br />Date : 02/082005 County :Las Animas Abbreviation : none <br />User : JRS Site :New Elk Mine Filename : C012-022 <br /> <br />Agency or organiza5on name :Colorado Division Of Minerals And Geology <br />Permit or other job action :2005 Bond Recalculation <br />Task description :Rip Access Roads Prior to Regrading <br />HOURLY EQUIPMENT COST ` <br /> Basic machine :Cat D9R - 9SU Horsepower : 405 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 :BOPS Cab Shift basis : 1 perday <br /> Attachment no. 2 : (shank ripper <br /> Data source : (CRG) <br /> Utilization °h <br />Cost Breakdown : Ownership cesfthour : $51.70 NA <br /> Dozer operating cosUhour : $93.54 100 <br /> Ripper operating cosUhour : $11.26 100 <br /> Operator cesVhour : $31.76 NA <br /> Total unit cosUhour : $188.26 Total fleet cost/trour : $564.78 <br />MATERIAL QUANTITIES <br />⢠Selected estimating method . Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 2.63 acres Rip depth (ft) : 2.00 Volume : 8,486 BCY or CCY <br />Source of estimated quantity :Map 11 <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - ab Condition Correction Factors - <br />Seismic : Seismic velocity : NA feeVsecond Unadjusted production <br />Unadjusted production : NA cu. yds.mour per selected method : 4,338.16 cu. yds./hour <br /> <br />Area : Avg, ripping depth : 4.05 feeVpass Site altitude : 7,500 feet <br />Average ripping width : 6.08 feeVpass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 200.00 feeVpass Job e(ficienq factor : 0.83 (1 shiR/day) <br />Average dozer speed : 88.00 feeUminute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutestpass <br />Production per unit area : 0.664 acresMour Adjusted unit production : 3,600.67 cu. yds.lhour <br />Unadjusted production : 4,338.16 w. ydsJhour Adjusted fleet production : 10,802.02 cu. yds./hour <br />
The URL can be used to link to this page
Your browser does not support the video tag.