Laserfiche WebLink
CIRCES Cost Estimatieg Software <br />• ,,, <br />PROJECT IDENTIFICATION <br />Task # : 011 State :Colorado Penniffjob # : G1981-012 <br />Date : 02/082005 County :Las Animas Abbreviation : none <br />User: JRS Site :New Elk Mine filename: C012-01i <br />Agency or organization name :Colorado Division Of Minerals And GeoJOgy <br />Permit or other job action :2005 Bond Recalculation <br />Task description : Rfp Cover Material at RDA for DWP <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :lshank ripper <br /> Data source : (CRGJ <br /> Utilization % <br />Cost reakdown : Ownership cosUhour : $51.70 NA <br />Dozer operating cosUhour : $93.54 100 <br />Ripper operating costRrour : $11.26 100 <br />Operator costAtour : $31.76 NA <br />Total unft cost/hour : $188.26 Total fleet r:ost/hour : $564.78 <br /> <br />MATERIAL QUANTITIES <br />• <br />Selected estimating method . Seismic <br />Aftemate methods - <br />Seismic : 17,200 BCY Load factor : NA Bank volume : 17,200 BCY <br />Area : NA acres Rip depth (ft) : NA Volume : NA BCY or CCY <br />Source of estimated quantity :Map 15; Division Estimate <br />Source of estimated load factor : NA <br />Aftemate methods - <br />3eismic : Seismic veloaty : 3,000 feeVsecond <br />Unadjusted production : 1,820.80 cu. yds./hour <br />Area : Avg. ripping depth : NA feeUpass <br />Average ripping width : NA feeUpass <br />Average dpping length : NA feet/pass <br />Average dozer speed : NA feethninute <br />Average maneuver time : NA minutes/pass <br />Production per unft area : NA acres/hour <br />Unadjusted production : NA dr. yds./hour <br />JOB TIME AND COST <br />• Ffeet size <br />Unit cost <br />3 dozers) <br />$0.125 per cu. yd. <br />Unadjusted production <br />per selected method : 1,820.80 cu. yds.lhour <br />Site altitude : 7,500 feet <br />Altitude adjustment : 1.00 (Cat HB) <br />Job eftictency factor : 0.83 (1 shiWday) <br />Net job correction : 0.83 multiplier <br /> <br />Adjusted unit production : 1,511.26 cu. yds./hour <br />Adjusted fleet production : 4,533.79 cu. yds./hour <br />Total job time <br />Total job cost <br />3.79 hours <br />$2,143 <br />~ ~tbrfi zs- zg~ ~- ~ -66 <br />