Laserfiche WebLink
HOURLY PRODUCTION sheet 2 of 2 <br />Haugna Capacity <br /> <br /> <br />J <br />Basis <br />Material weight : 1,600 pounds/LCY <br />Material description <br />Coat -Bituminous, Raw <br />Rated payload : 48,000 pounds <br />Payload cepaaty : 30.00 LCY <br />Bowl (volume) Basis <br />Struck volume : 14.00 LCY <br />Heaped volume : 20.00 LCY <br />Average volume : 17.00 LCY <br />Adjusted capacity : 1 ], 00 LCY "' <br />hourly production reflects vowme per scraper pair on push-pull models <br />Cvcle Time : ~ ob Condition Corrections : Site altitude (ft.) : 7,500 <br /> Scraper Push dozer Source <br />Scraper loading time' : 0.40 minutes Altitude adj.: 1.000 1.000 (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency . 0.830 0.830 (Cat HB) <br />• was time per steps patron pash.pun models Net correction . 0.830 0.830 <br />Travel time <br />Road condition description :Fimr, smooth, rolling, dirt/It. surfaced, watered, maintained <br />Haul Route <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Veloaly (fpm) Travel time (min.)" <br />1 1,500 2.00 3.00 5.00 2218 0.80 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 0.80 minutes <br />Retum route <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />''travel dme rot each segment is adiuswd wr axeleraflon/deceiaratlon. Retum time : 0.62 minutes <br />fade velotiliea are max aflainable per total resistance shown, trot average <br />Total scraper team cycte time (load + haul + maneuver and spread + return) : 2.42 minutes <br />Unadjusted unit production/hour : 421.60 LCY/hour "' Adjusted for job conditions : 349.92 LCYRtour <br />Optimal number of scrapers per push dozer : 3 Selected number of scrapers : 2 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 699.85 LCYRtour <br />Adjusted multiple scraper team (fleet) houry production : 699.85 LCY/hour <br /> <br />JOB TIME AND COST` <br />Fleet size : 1 Team(s) Total job time : 8.04 Hours <br />Und cost : EO 830 /LCY Total job cost : $4, 673 <br />~xbr(ot-f" Z~- ZL <br />/-Zm -06 <br />