Laserfiche WebLink
3. Descn'be the measures to be taken for release of a reportable quantitq of a ha~arrL,na material or <br />the release of a toxic substance. This includes plans for spr71 prevention, containment, <br />notiSplion, and cleanup. <br />H. Reclamation. Describe the annual and Emil reclamation standards based on the aaticq~ated <br />schedule for construction, operations, and project closure. Include such items as the removal of <br />structures and facilities including bridges and culverts, a revegetation plan, permanent <br />~taainment of mine tailings, waste, or sludges which pose a threat of a release i~o the <br />environmeirt, closing ponds and eliminating standing water, a float surface shaping Plan, and <br />post operations monitoring and maintenance plans. <br />dug nits. trencfies. and excavations within dre immediate area ofoperations will also be reclaimed. <br />and the South Park Raoszer District. h also includes treating with aeration and introduciae o~7- <br />degrading bacteria. <br />monitored anm~allYfor growth If reclamation should not be successful for anygiven site. the <br />